Forwards Final Deficiency Rept Re Omission of Vertical Reinforcing Steel in Fuel Handling Bldg Wall.Corrective Action to Be Implemented Prior to 800215
ML19290E596
Person / Time
Site: Satsop
Issue date: 01/31/1980
From: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19290E588 List:
References
GO3-80-199, NUDOCS 8003140257
Download: ML19290E596 (1)


Text

e eg Washington Public Power Supply System A JOINT OPERATING AGENCY P.O.Soll1223 EL M A. W A5HINGTON 98541 PHONE 1206! 249 5001 January 31, 1980 G03-80-199

(@4g-g mr g bg Nh U. S. tiuclear Regulatory Commission f

pg, e '~g

.c Region V c1 1990 North Californi Boulevard h-i Suite 202, Walnut Creek Plaza Q\\

/?g j i

/

Walnut Creek, California 94596 GN (8/

g,s Attention:

Mr. R. H. Engelken Y

Director of Regulatory Operations

Dear fir. Engelken:

Subject:

WPPSS NUCLEAR PROJECT i;0. 3 DOCKET NUMBER 50-508 REPORTABLE DEFICIENCY, 10CFR50.55(e)

DEFECT / NONCOMPLIANCE REPORT NO. 008

Reference:

G03-79-2253, N. O. Strand to R. H. Engelken, same subject, dated December 3, 1979.

In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on November 2,1979 of a reportable condition involving the omission of vertical reinforcing steel in the shear wall separating the WNP-3 Ebel Handling Building and the Reactor Auxiliary Building. Attached is our final report concerning this deficiency.

All corrective action discussed in the final report will be imple-mented prior to our targeted placement of February 15, 1980.

Please contact us if you require additional information.

Very truly yours, Yw N. O. STRAND Managing Director Attachments cc: