Forwards IE Insp Rept 50-358/79-39 on 791212-14 & Notice of Violation
ML19290E532
Person / Time
Site: Zimmer
Issue date: 01/18/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML19290E533 List:
References
NUDOCS 8003140167
Download: ML19290E532 (2)


See also: IR 05000358/1979039

Text

w'

r

'

'

UNITED STATES

!'

'n

NUCLEAR REGULATORY COMMISSION

c

REGION ill

g

c

e[

799 ROOSEVELT ROAD

a

o,

GLEN ELLYN. ILLINol$ 60137

p

a. a 880

Docket No. 50-358

Cincinnati Gas and Electric

Company

ATTN:

Mr. Earl A. Borgmann

Vice President Engineering

139 East 4th Street

Cincinnati, OH

45201

Gentlemen:

This refers to the inspection conducted by Messrs. T. Vandel, J. Hughes,

G. Maxwell, and H. Wescott, of this office on December 12-14, 1979, of

activities at Wm. H. Zimmer Nuclear Power Plant authorized by NRC Con-

struction Permit No. CPPR-88 and to the discussion of our findings with

Messrs. B. Culver, W. Schwiers and others at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted of

a selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed Appendix

A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

thirty days of your receipt of this notice a written statement or expla-

nation in reply, including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action to be taken

to avoid further noncompliance; and (3) the date when full compliance will

be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

8003140 1 6 4

.._.._.. _ ._ _ _ _.--

.

Cincinnati Gas and

-2-

Electric Company

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the infarmation is

considered proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

'

/

,

.

Gaston Fiorelli,

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-358/79-39

cc w/ enc 1:

Mr. J. R. Schott, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power Siting

Commission

Citizens Against a Radioactive

Environment

Helen W. Evans, State of Ohio

.