Forwards IE Insp Repts 50-348/79-45 & 50-364/79-22 on 791203-29.No Noncompliance Noted
ML19290E518
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/24/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19290E519 List:
References
NUDOCS 8003140154
Download: ML19290E518 (2)


See also: IR 05000348/1979045

Text

J,

C

$n arc

UNITED STATES

M -S6

p

o,j

,7,

NUCLEAR REGULATORY COMMISSION

EM </

,

gq

>~r

REGION ll

g....**e'['

o, y

101 v ARIETTA ST., N.W., SUITE 3100

ATLANTA, G EORGI A 303o3

JAN 2 41350

In Reply Refer To:

RII:WHB

50-348/79-45

50-364/79-22

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. H. Bradford of this office on

December 3-29, 1979, of activities authorized by NRC License No. NPF-2 and

Construction Permit No. CPPR-86 for the Jarley facility, and to the discussion

of our findings held with W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

W

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

See Page 2

80031 B \\M

.

J

Duke Power Company

-2-

JAN 2 41930

,

Enclosure:

Inspection Report Nos. 50-348/79-45

and 50-364/79-22

cc w/ enc 1:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

J. T. Young

Vice President-Production

Post Office Box 2614

Birmingham, Alabama 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Ilo11 ands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312