Text
j Yi C-Pg Washington Public Power Supply System A JOINT OPERATING AGENCY SS December 13, 1979 v
O Docket Nos.
50-508 p
og g
a nd 50-509 Jp/ s 3
U.S. fluclear Regulatory Commission g
fg Suite 202, Walnut Creek Plaza 1990 N. California Boulevard 6-4 Walnut Creek, CA 94596 N _ 4-I Attention: Mr. R. H. Engelken
SUBJECT:
WPPSS NUCLEAR PROJECTS NOS. 3 & 5 IE BULLETIN 79-02, REVISION 2
" PIPE SUPPORT BASE PLATE DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS".
Reference:
D. L. Renberger letter to R. H. Engel ken dated July 10,1979, on IE Culletin 79-01 Revision 1, same subject Drar Mr. Engel ken:
In the referenced letter, which was our response to IE Bulletin 79-01 Revision 1, it was indicated that there was no plan to use concrete expansio'n anchors for attachment of Seismic Class I pipe supports for WNP-3/5.
Since there has been no change in plans for utilizing concrete expansion anchors, the criteria prescribed in the bulletin does not apply to these projects.
Very truly yours, N
y D. L. Renberger Assistant Director--Technology DLR:FJ:crw 8003110327