ML19290E442

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800130 Final Deficiency Rept Re Natural Gas Pipeline Break Analysis.Matter Referred to IE for Review
ML19290E442
Person / Time
Site: Perry  
Issue date: 02/20/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8003110249
Download: ML19290E442 (1)


Text

T!G

" "8 0 t>

0g UNITED STATES f,

NUCLEAR REGULATORY COMMISSION

+

f,S

[

TP RE GION 111 5

f 799 ROOSEVELT RO AD k

/

aten ettyn, attisors soisi FEB 2 01980 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President - System Engineering and Construction Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

Thank you for your final report dated January 30, 1980, pursuant to 10 CFR 50.55(e) regarding natural gas pipeline break analysis.

We have referred this matter to NRC-liq for review and have closed the 10 CFR 50.55(e) itera in our records.

Your cooperation with us is appreciated.

Since rely,

d fl G.

Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:

Centra) Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Mr. Daniel D. Wilt, Attorney Helen W. Evans, State of Ohio

]

80 0h 10 2Y