f T /C-PP W shington Public Power Supply System A JOINT OPERATING AGENCY S-
- e. o so n...
s ooo c.. o. w...~.,c ~ w.,
a,c,. t. ~ o w..~,~ c ro ~. 3 s 2 e-o~. r sosi 37s sooo November 8, 1979 Docket Nos. 50-508 and 50-509 Mr. R. H. Engelken U.S. Nuclear Regulatory Commission Suite 202, Walnut Creek Plaza 1990 N. California Boulevard Walnut Creek, CA 94596
. q',' ' ' t ' f,4 at v,\\
SUBJECT:
WPPSS NUCLEAR PROJECTS NOS. 3&5 6'/
"A d. Odl ". M.
E IE BULLETIN 79-23
Dear Mr. Engelken:
I;.
1 c.
',;ff The following information is submitted for your consideration' 7p g in response to the subject IE Bulletin:
Item 1 The diesel generators for WNP-3/5 plants are not connect-ed in the manner described in the subject bulletin; there-fore, this item does not apply to these units.
Item 2 The schedule for the completion of a sustained full-load operation test of the EDC's for a duration of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is yet to be determined.
- However, this test will be conducted prior to fuel load.