See also: IR 05000271/1979021

Text

?! Ca

h

UNITED STATES

km REco

f[

o

NUCLEAR REGULATORY COMMisslON

REGION I

.

') gy (

g

-

A

g

631 PARK AVENUE

,_

.h

l.

f

KING OF PRUSSI A, PENNSYLV ANIA 19406

s, w /

.g 4

1980

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Robert H. Groce

Licensing Engineer

20 Turnpike Road

Westborough, Massachusetts 01581

Gentlemen:

Subject:

Inspection 50-271/79-21

This refers to the inspection conducted by Mr. W. Raymond of this office on

November 28 - November 30, 1979, at Vermont Yankee Nuclear Power Station,

Vernon, Vermont, of activities authe-ized by NRC License No. DPR-28 and to the

discussions of our findings held by Mr. Raymond with Messrs. L. Heider and W.

Conway at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct the item of

noncompliance brought to your attention in a letter dated October 26, 1979.

We

have no further questions regarding your action at this time.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

conside id by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

8003 0g 0 0 2 '3

.

.

Vermont Yankee Nuclear Power

2

JAN 4

1980

Corporation

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

t

o

-

I

onJ(orunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-271/79-21

cc w/ encl:

W. F. Conway, Plant Superintendent

Ms. J. Abbey, Technical Secretary