Assigns Responsibilities for Final Geis.Must Develop Provisional long-term Environ Monitoring Requirements for Demonstrating Compliance W/Applicable Reclamation Criteria. First Drafts of Assigned Efforts Due by 800321
ML19290E074
Person / Time
Issue date: 02/15/1980
From: Scarano R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Eadie G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19290E075 List:
References
REF-PROJ-M-25 NUDOCS 8003040176
Download: ML19290E074 (1)


Text

%b

g. aec 8

UNITED STATES i

NUCLEAR REGULATORY COMMISSION h,

8 *')g g

7,,

j WASHINGTON, D. C. 20555

/

FEB 15 880 MEMORANDUM FOR:

Gregory G. Eadie Uranium Recovery Licensing Branch FROM:

Ross A. Scarano, Chief Uranium Recovery Licensing Branch

SUBJECT:

TASK ASSIGNMENT As you are aware, the Final GEIS on uranium milling is now being prepared under.the direction of D. Martin, the GEIS Project Manager.

Substantial technical issues and public comments in the general area of environmental monitoring require resolution as part of this effort.

With respect to the preparation of the Final GEIS you are assigned the following responsibilities:

1.

Provide responses to all substantive public comments on environmental monitoring, as provided by D. Martin.

2.

Develop provisional environmental monitoring requirements for adequately demonstrating compliance with:

a) site cleanup criteria as stipulated in the WMUR branch position; and b) the reclamation performance objectives and technical criteria contained in the Draft GEIS.

3.

Develop provisional long-term environmental monitoring requirements for adequately demonstrating compliance with applicable reclamation criteria, together with estimated costs (analyses) and man-hours (sample collection, other on-site inspection and survey efforts).

Typewritten first drafts of all above assigned efforts are to be prepared and submitted for review by the GEIS Project Manager 6 later than March 21, 1980. This date is not negotiable.

Ross A. Scarano, Chief Uranium Recovery LicenF-- Branch Division of Waste Managema-t cc:

K. Hamill, WMUR J. Linehan, WMUR H. Miller, WMUR D. Martin, WMUR D. Harmon, OSD E. Grammer, ELD 800304 0 k7h