ML19290E040

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800128 Interim Deficiency Rept Re Laminations in Raceway Hanger Support Steel
ML19290E040
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/12/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 8003040056
Download: ML19290E040 (1)


Text

'

o arco UNITED ST ATES f

J.,

NUCLEAR REGULATORY COMMISSION

$ } ty y

S REGION lit f

799 ROOSEVELT RO AD

\\

/

oLcN ELLvN. itusois som FEB 121980 Docket No. 50-341 The Detroit Edison Company ATIN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your interim report dated January 28, 1980, pursuant to 10 CFR 50.55(e) regarding laminations in raceway hanger support steel, we will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely, s

- N

. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney 8003040 C $

59