ML19290E039

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800129 Interim Deficiency Rept Re Pressurizer Heater Sys.Nrc Review Will Be Conducted Upon Receipt of Util Final Rept
ML19290E039
Person / Time
Site: Midland
Issue date: 02/12/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8003040053
Download: ML19290E039 (1)


Text

TIC,

..""'8 UNITED STATES 09

  • NUCLE AR REGULATORY COMMISSION REGloN 111 of 799 ROOSEVELT ROAD k

/

GLEN ELLYN, ILUNOIS 6007 FEB12iggo Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:

Mr. Stephen 11. Ilowell Vice President 1945 West Parnall Road Jackson, MI 49201 Centlemen:

Thank you for your interim report dated January 29, 1980, pursuant to 10 CFR 50.55(e) regarding pressurizer heater system.

We will conduct our review upon receipt of your final report.

Your cooperation with us is appreciated.

Sincerely, SY G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago 8003040$ g