ML19290E006

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800123 Interim Deficiency Rept Re Item on Reactor Auxiliary Bldg Reduced Floor Load.Util Will Submit Addl Info Re Why Rebar Was Cut & Initial Evaluation of Potential Safety Significance
ML19290E006
Person / Time
Site: Fermi 
Issue date: 02/12/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 8003040001
Download: ML19290E006 (1)


Text

kb UNITED STATES p* 88%q'*g d

NUCLEAR REGULATORY COMMISSION

[

t REcioN HI 5

'f 799 ROOSEVELT 90AD

/

GLEN ELLYN,ILUNOtt 60137 FEB 1z wo Docket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your interim report dated January 23, 1980, pursuant to 10 CFR 50.55(e) regarding item on reactor auxiliary building reduced floor load.

Per our phone conversation on February 6, 1980, with the EF2 Site Project Quality Assurance Engineer, we understand that you will be submitting additional interim information address-ing why the rebar was cut and an initial evaluation of the potential safety significance of the problem.

Your cooperation with us is appreciated.

Sincerely, t

s G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney u o ua 0 4oooi

.