Forwards IE Insp Repts 50-498/79-22 & 50-499/79-22 on 791211-14.No Noncompliance Noted
ML19290E003
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/10/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19290E004 List:
References
NUDOCS 8002290630
Download: ML19290E003 (2)


See also: IR 05000498/1979022

Text

__

UNITED STATES

/[C

s"t,,'

g

NUCLEAR REGULATORY COMMISSION

.;

-

f

^

REGION IV

?

I

_

611 RY AN PL AZ A DRIVE. SulTE 1000

'

yg

j

ARLINGTON TEX AS 7G012

'f

'-t

,

( _v.Af f

,,,,,e

January 10, 1980

In Reply Refer Tc

RIV

Docket No.

50-498/Rpt. 79-22

50-499/Rpt. 79-22

Houston Lighting and Power Company

ATTN:

Mr. E. A. Turner, Vice President

Power Plant Construction and

Technical Services

Post Office Box 1700

Houston, Texas

77001

Gentlemen:

This refers to the inspection conducted by Mr. W. G. Hubacek of our staff

during the period December 11-14, 1979, of activities authorized by NRC

Construction Permits No. CPPR-128 and 129 for South Texas Project, Units 1

and 2, and to the discussion of our findings with Mr. L. D. Wilson and

other members of your staff at the conclusion of the inspection.

Areas exwnined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were identified.

Two new unresolved items are identified in paragraphs 3 and 4 of the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NBC's Public Document Poom.

If the report contains any information that you believe to be proprietary,

it is necessary that you submit a written application to this office, within

20 days of the date of this letter, requesting that such information be

withheld from public disclosure.

The application must include a full state-

ment of the reasons why it is claimed that the information is proprietary.

The application should be prepared so that any proprietary information

identified is contained in an enclosure to the application, since the

application without the enclosure will also be placed in the Public Document

Roca.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

800220a& 3 O

Houston Lighting and Power Company

2

January 10, 1980

Should you have any questions concerning this inspection, we vill be pleased

to discuss them with you.

Sincerely,

/ h'Y

-

N

Seidkd, Chief

W. C.

Reactor Cohtruction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-498/79-22

50-499/79-22