ML19290D926
| ML19290D926 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah, 07002913 |
| Issue date: | 09/11/1979 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | |
| References | |
| 14186, NUDOCS 8002290495 | |
| Download: ML19290D926 (1) | |
Text
--
TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENN ESSEE 37401 4
400 Chestnut Street Tower II September 11, 1979 cp. VI' /.,g W.
T.
Crow, Section Leader EZ'/D Uranium Fuel Fabrication Section U
[f--
O Fuel Processing & Fabrication Branch (2
SEP2
- 379,g Division of Fue1 Cycle and UN Q
Material Safety u s. %,,,",
U.S.
Nuclear Regulatory Commission M,
n Washington, DC 20555
.TO.A 4[
j\\Q?
- s. ?,,
TN
Dear Mr. Crow:
' ' ' / y W In the Matter of the Application
)
Docket No. 50-328 Tenneasee Valley Authority
)
This is to formally document a telephone discussion between J.
C.
Delaney of your staff and a representative of my staff today concerning Sequoyah Nuclear Plant unit 2 special nuclear material (SNM) license application.
The maximum enrichment of the initial core for the Sequoyah unit 2 fuel assemblies is 3.10 +.05 weight percent U-235.
TVA requests that the SNM license permit storage up to 3.15 weight percent U-235 instead of the 3.5 percent as stated in the application.
The Sequoyah unit 2 fuel will be stored in the new fuel storage vault and/or spent fuel pit located within Sequoyah unit 1 vital area.
Sequoyah unit 1 is protected by TVA's nuclear plant physical security progran and it is now in effect.
Very truly yours, TENNESSEE VALIFY AUTHORITY
)
A L.
M.
Mills,iManager Nuclear Regulation and Safety
- MT T
L :%
4' y
\\
/
I'6 An Equal Opportunity Emmoyer
.