Forwards IE Bulletin 80-03, Loss of Charcoal from Std Type II,Two-Inch,Tray Adsorber Cells. Action Required
ML19290D380
Person / Time
Site: Rancho Seco
Issue date: 02/06/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8002210305
Download: ML19290D380 (1)


Text

Mb

>R RfCog y

Ig UNITED STAT ES y '*

,r, g

NUCLEAR REGULATORY COMMISSION

r. -l-

': y REGION V 0,

1990 N. CALIFORNIA BOULEVARD

,o',a SUITE 202, WALNUT CRE EK PLAZA

  • ee,*

WAt NUT CREEK, CALIFORNIA 94596 February 6, 1980 Docket No. 50-312 Sacramento Municipal Utility District P. O. Box 15830 Sacramento, California 95813 Attention: Mr. John J. Mattimoe Assistant General Manager Gentlemen:

Enclosed is IE Bulletin No. 80-03, which requires action by you with regard to your reactor facility with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, l

~/?

R. H. Engelken Director

Enclosures:

1.

IE Bulletin No. 80-03 2.

List of Recently Issued IE Bulletins cc w/ enclosures:

R. J. Rodriguez, SMUD L. G. Schwieger, SMUD 800n210 3,T Q,

SSINS No.: 6820 UNITED STATES Accessions No.:

NUCLEAR REGULATORY C0!!ilSSION 7912190669 0FFICE OF INSPECTION AND ENFORCE *1ENT WASHINGTON, D.C.

20555 February 6, 1980 IE Bulletin No. 80-03 LOSS OF CHARC0AL FR0't STANDARD TYPE II, 2 INCH, TRAY ADSORBER CELLS Description of Circunstances:

During preliminary leak tests of charcoal adsorber cells in certain ventilation systems at Sequoyah Nuclear Plant, it was determined that on certain adsorber cells the spacing between rivets securing the perforated screen to the casing was too creat to ensure adequate contact between the casing and the screen, thus allowing charcoal to escape.

The problem was discovered when a visual inspection detected loose charcoal on the floor of the filter housings and on the outside horizontal surfaces of the adsorber cells.

Loss of charcoal was also indicated by observation of light penetrating through the cells. Additional inspection revealed that the rivets securing the oerforated screens to the cell casing were approxinately six inches apart and the screen appeared to be sagging away from the casing between rivets.

The particular adsorber cells being tested at Sequoyah Nucleae Plant were Flanders Type II pre-1974 fabrication.

There is a possibility that design of adsorber cells with wide spacing between screen rivets may pass initial freon leak tests but degrade significantly during operation thus reducing the nargin of safety during postulated accidents.

The responses from this Bulletin will be used by the NRC to evaluate need for more frequent inspection / testing.

For all power reactor facilities with an Operating License:

1.

Determine if charcoal adsorber cells in use, or nroposed for use, have the potential for a loss of charcoal incidental to handling, storage or use (as appropriate). Particular attention should be directed to examina-tion of a) rivet spacing esultino in separation of screen and cell housing and b) adsorber cell or filter housing deformation causing loss of charcoal and/or channeling. Either of these items could result in a degraded filtration system incapable of cerforming its intended function.

The preferred method of this determination is a visual inspection of r?t filter housing and adsorber cells as described in Section 5 of ANSI N510-1975.

If this method is not feasible, state in the report required by Paragraph 4 how the determination was made.

2.

For ESF filtration systems, any identified defective cells shall be replaced and the operability of the system (after cell replacenent)

IE Bulletin flo. 80-03 February 6, 1980 Page 2 of 2 denonstrated by leak testing within 7 days. Preferred method of leak testing is as described in Regulatory Guide 1.52 and Section 12 of AflSI f1510-1975.

3.

For normal ventilation exhaust filtration systems which employ charcoal adsorber cells and for which radioactive removal efficiency has been assumed in determining compliance with the "as low as reasonably achievable" design criteria of 10 CFR 50, Apoendix I, any identified defective cells shall be replaced as soon as nossible but at least within 30 days.

After replacement, the system should be demonstrated operable by leak testing within an additional 30 days.

Preferred nethod of testina is as described in Regulatory Guide 1.140 and Section 12 of ANSI fl510-1975.

4.

Report in utriting within 45 days of the date of this Bulletin the results of the determination required by Paragraph 1.

The report shall include the type of cells emnloyed (nanufacturer and cell design), system containing the cells, observed cell condition (dearadation/ sagging) and a discussion of visual inspaction procedure and results.

For all Power Reactor Facilities with a Construction Permit:

1.

Visual inspection shall be conducted only if the charcoal adsorber cells have been purchased and shipment received. A representative number (aporoxinately 5) of each type of cell design / manufacturer shall be visually inspected for such deficiencies as rivet spacing and screen / casing separation which could lead to loss of charcoal incidental to handling, storage, or use.

2.

Report in writing within 45 days of the date of this Bulletin the results of the inspection required by Paragraph 1.

The report shall include the type of cells (ranufacturer and cell design), observed cell condition (degradation / sagging) and a discussion of the inspection procedure and resul ts.

Reports shall be sent to the Director of the approariate flRC Regional Office listed in Appendix 0 of 10 CFR 20 with a copy of the Director, Division of Fuel Facility and Materials Safety Inspection, Office of Inspection and Enforcement, USflRC, Washington, D.C.

20555.

Aporoved by GAO, B180225(R0072); clearance exoires, 7/31/80. Aporoval was given under a blanket clearance specifically for identified aeneric problems.

IE Bulletin No. 80-03 Enclosure February 6,1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

80-02 Inadequate nuality

/21/80 All BWR licenses with Assurance for Nuclear a CP or OL 80-01 Operability of ADS Valve 1/11/80 All BWR power reactor Pneumatic Supply facilities with and OL 79-01B Environnental Oualification 1/14/80 All power reactor of Class IE Equipment facilities with an OL 79-28 Possible Malfunction of 12/7/79 All power reactor Namco l'odel EA 180 Limit facilities with an Switches at Elevated OL or a CP Temperatures 79-27 Loss Of Non-Class-1-E 11/30/79 All oower reactor Instrumentation and facilities holding Control Power Systen Bus OLs and to those During Operation nearing licensing 79-26 Baron Loss From BWR 11/20/79 All BWR power reactor Control Blades facilitier with an OL 79-25 Failures of Westinghouse 11/2/79 All power reactor BFD Relays In Safety-Related facilities with an Systens OL or CP 79-17 Pipe Cracks In Stagnant 10/29/79 All PWR's with an (Rev. 1)

Borated Water Systen At OL and for information PWR Plants to other power reactors 79-24 Frozen Lines 9/27/79 All oower reactor facilities which have either OLs or cps and are in the late stage of construction 79-23 Potential Failure of 9/12/79 All Power Reactor Emerqency Diesel Facilities with an Generator Field Operating License or Exciter Transformer a constructi.,n permit