Forwards IE Bulletin 80-03, Loss of Charcoal from Std Type II,Two-Inch,Tray Adsorber Cells. Action Required
ML19290D369
Person / Time
Site: Yankee Rowe
Issue date: 02/06/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kay J
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 8002210290
Download: ML19290D369 (1)


Text

  1. o, UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

5 E

REGION I 4,*****,o'[

0 6.11 PARK AVENUE 4

KING OF PRUSSIA, PENN!YLVANIA 19406 FEB 0 6 1980 Docket No. 50-29 Yankee Atomic Electric Company ATTN:

Mr. James A. Kay Senior Engineer - Licensing 25 Research Drive Westborough, Massachusetts 01581 Gentlemen:

Enclosed is IE Bulletin No. 80-03 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, W.

Boyce H. Grier M irector

Enclosures:

1.

IE Bulletin No. 80-03 2.

List of Recently Issued IE Bulletins CONTACT:

G. H. Smith (215-337-5200) cc w/encls:

H. Autio, Plant Superintendent J. E. Tribble, President 8002210 y

4' ENCLOSURE 1 SSINS No.: 6820 UNITED STATES Accessions No.:

NUCLEAR REGULATORY COMMISSION 7912190669 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 80-03 Date: February 6,1980 Page 1 of 2 LOSS OF CHARC0AL FROM STANDARD TYPE II, 2 INCH, TRAY ADS 0RBER CELLS Description of Circumstances:

During preliminary leak tests of charcoal adsorber cells in certain ventilation systems at Sequoyah Nuclear Plant, it was determined that on certain adsorber cells the spacing between rivets securing the perforated screen to the casing was too great to ensure adequate contact between the casing and the screen, thus allowing charcoal to escape.

The problem was discovered when a visual inspection detected loose charcoal on the floor of the filter housings and on the outside horizontal surfaces of the adsorber cells.

Loss of charcoal was also indicated by cbservation of light penetrating through the cells.

Additional inspection revealed that the rivets securing the perforated screens to the cell casing were approximately six inches apart and the screen appeared to be sagging away from the casing between rivets.

The particular adsorber cells being tested at Sequoyah Nuclear Plant were Flanders Type II pre-1974 fabrication.

There is a possibility that design of adsorber cells with wide spacing between screen rivets may pass initial freon leak tests but degrade significantly during operation thus reducing the margin of safety during postulated accidents.

The responses from this Bulletin will be used by the NRC to evaluate need for more frequent inspection / testing.

For all power reactor facilities with an Operating License:

1.

Determine if charcoal adsorber cells in use, or proposed for use, have the potential for a loss of charcoal incidental to handling, storage or use (as appropriate).

Particular attention should be directed to exam-ination of a) rivet spacing resulting in separation of screen and cell housing and b) adsorber cell or filter housing deformation causing loss of charcoal and/or channeling.

Either of these items could result in a degraded filtration system incapable of performing its intended function.

The preferred method of this determination is a visual inspection of the filter housing and adsorber cells as described in Section 5 of ANSI N510-1975.

If this method is not feasible, state in the report required by Paragraph 4 how the determination was made.

~'

\\

IE Bulletin No. 80-03 Date: February 6, 1980 Page 2 of 2 2.

For ESF filtration systems, any identified defective cells shall be replaced and the operability of the system (after cell replacement) demonstrated by leak testing within 7 days.

Preferred method of leak testing is as described in Regulatory Guide 1.52 and Section 12 of ANSI N510-1975.

3.

For normal ventilation exhaust filtration systems which employ charcoal adsorber cells and for which radioactive removal efficiency has been assumed in determining compliance with the "as low as reasonably achievable" design criteria of 10 CFR 50, Appendix I, any identified defective cells shall be replaced as soon e3 possible but at least within 30 days.

After replacement, the system sb]uld be demonstrated operable by leak testing within an additional 30 days.

Preferred method of testing is as described in Regulatory Guide 1.140 and Section 12 of ANSI N510-1975.

4.

Report in writing within 45 days of the date of this Bulletin the results of the determination required by Paragraph 1.

The report shall include the type of cells employed (manufacturer and cell design), system containing the cells, observed cell condition (degradation / sagging) and a discussion of visual inspection procedure and results.

For all Power Reactor Facilities with a Construction Permit:

1.

Visual inspection shall be conducted only if the charcoal adsorber cells have been purchased and shipment received.

A representative number (approximately 5) of each type of cell design / manufacturer shall be visually inspected for such deficiencies as rivet spacing and screen / casing separation which could lead to loss of charcoal incidental to handling, storage, or use.

?.

Report in writing within 45 days of the date of this Bulletin the results of the inspection required by Paragraph 1.

The report shall include the type of cells (manufacturer and cell design), observed cell condition (degradation / sagging) and a discussion of the inspection procedure and results.

Reports shall be sent to the Director of the appropriate NRC Regional Office listed in Appendix D of 10 CFR 20 with a copy to the Director, Division of Fuel Facility and Materials Safety Inspection, Office of Inspection and Enforce-ment, USNRC, Washington, D.C.

20555.

Approved by GAO, B180229(R0072); clearance expires, 7/31/80.

Approval was given under a blanket clearance specifically for identified generic problems.

a r

ENCLOSURE 2 IE Bulletin No. 80-03 Date: February 6,1980 Page 1 of 1 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

79-25 Failures of Westinghouse 11/2/79 All Power Reactor BFD Relays in Safety-Facilities with an Related Systems Operating License (OL) or Construction Permi (CP) (for Action) 79-02 Pipe Base Plate Designs 11/8/79 All Power Reactor (Rev. 2)

Using Concrete Expansion Facilities with an Bolts OL or CP 79-26 Boron Loss From BWR 11/20/79 All BWR Power Reactor Control Blades Facilities with an OL 79-27 Loss of Non-Class-1-E 11/30/79 All Power Reactor Instrumentation and Con-Facilities with an OL trol Power System Bus and those nearing During Operation Licensing (for Action)

All Power Reactor Facilities with a CP (for Information).

79-28 Possible Malfunction 12/7/79 All Power Reactor of NAMCO Model EA180 Facilities with an Limit Switches at OL or C?

Elevated Temperatures79-01B Environmental Quali-1/14/80 All Power Reactors fication of Class IE with an OL except Equipment SEP Plants 80-01 Operability of ADS Valve 1/14/80 All BWRs with an Pneumatic Supply OL 80-02 Inadequate Quality 1/21/80 All BWRs with an Assurance for Nuclear OL or CP Supplied Equipment