ML19290C958
| ML19290C958 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, Oconee, Arkansas Nuclear, Crystal River, Rancho Seco, Crane |
| Issue date: | 02/14/1980 |
| From: | Taylor J BABCOCK & WILCOX CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19290C959 | List: |
| References | |
| NUDOCS 8002150255 | |
| Download: ML19290C958 (1) | |
Text
Babcock &Wilcox Pc.e, ceme,auco c,cen P.o. Box 1260. Lynchburg, Va. 245o5 Tele;hene: (804) 324-5111 Febuary 14, 1980 Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors Office of Nuclear Regulatory Commission Washington, D. C.
20555 References (1)
Victor Stello, Jr., Director, DOR, to all PWR Licensees,
January 25, 1978, Subject - Reactor Pressure Vessel Support System (2) NRC Memorsodum, S. B. Hosford to Darrell G. Eisenhut, November 20, 1979, Summary of Meeting with the Babcock Wilcox Owners Group, Octcber 24, 1979, on Asymmetric LOCA Loads.
Dear Mr. Eisenhut:
x Enclosed are twelve (12) copies of BAW-1597, " Effects of Asynmetric LOCA Loadings - Phase II Status", "ated February,1980.
This report is being submitted by Babcock & Wilcox on benalf of the B&W 177 Fuel Assembly Gwners Group and will be referenced by the Owners Group utilities on their ind.vidual docke ts.
This interim report has been prepared in accordance with references (1) and (2) and provides a basis for concluding that continued operation of the following B&W plants is justifisble: Oconee 1, Oconee 2, Oconee 3, Crystal River 3, Three Mile Island-1, Arkansas Nuclear One-1, Rancho Seco, and Davis-Besse 1.
The final report, in accordance with reference (2), will be submi tted to the NRC no later than July 1,1980.
If you have any questions concerning BAW-1597, please contact Mr. William R. Speight (Ext. 2902) of my staff.
Very truly yours,
/ J. H. Taylor Manager, Licensing JHT:WRS:dcr cc:
W. R. Speignt 8002150T 7 5 The Babccck & Wilcox Ccrrrany / Establahed IE67
"w.
,_7..-.
~
~
,,,q- ~
+
f-
'..j. ~,. ~ _
t
^
l.__
['.'
- ]
f 5 *.,
~. ^ " - '
~.
p.
g,
.e n_
-~.rr
EFFECTS OF ASYMMETRIC LOCA LOADINGS
- Phase ll Status -
BAW-1597 February 1980 Babcock &Wilcox
- - - - -.