RO 50-259/804:on 800118,w/Unit 1 in Refueling Outage,Water Cleanup Sys Inboard Primary Containment Isolation Valve 69-1 Had Indication Requiring Repair.Cause Unknown.Indication Removed
ML19290C681
Person / Time
Site: Browns Ferry 
Issue date: 01/18/1980
From: Abercrombie H
TENNESSEE VALLEY AUTHORITY
To:
References
NUDOCS 8002040495
Download: ML19290C681 (1)


Text

  • l TELEcovi to EEC

,'ll?}RC REamn January 18,1980 "NTA oger-;p

~

/M4 m

U. S. Nuclear Regulatory Cocnission

.;) J/lN 2l A g *. l g P. o cutuod Begion 11 W. a xeg.g F 12NG 101 Marietta straat, W

,{AtafURPNy Satte 3100

/ g>C f k cu"g'f..+

Atlanta, Georgia 30303 g

y BTRO-3D-239/804 Itaported under Technical Specificatiott 4.7.2.A.3 Date of Occurrence: 1/18/80 Time of occurrence: 10:50 a.m.

Unit 1 Iuchnical Specification involvedt 3.6.C Conditions Prior to Occ.2rrence: Unit i f.n refui: ling outage; unit 2 at 1,07S Ede, in normal operation; unit 3 being returned to service following reactor trip from turbine stop vs1ve closure.

Identification and Deceription of Ocettrrence; Reactor water ciennup syntesa inboard primary containment isolacion valve 69-1 has* indications re:guLring repair at veld DRRc-14.

This Ladication is approxInstely 7/E-inch in length on the circu:nference of the 6-inch stainless-steel line.

The indi-ention is 20 percent of wall and is located less than 1/2-inch from the inboard elbow-te-valve veld.

Apparent Cause of Occurrence: tini.nem et this time.

Other Melated Events: 3rone.

Corrective Action Taken or Planned: The indicattan will be removed and the weld repaired during this refueling outage.

r

.+f d'(' /

'W II. L. Abercrochie

@' h 6 z

D l -)

((

3 Power Plant Superintendent Browns Ferry Nuclear Plant U

L JdJ Q

[

ee s

\\

% /