LER 79-123/03L-0:on 791207,svc Water Pump 3 Strainer Motor Burned Up.Caused by Single Phasing in Breaker BE1280 on Motor Control Ctr E12C.Breaker Repaired on 791212 & Returned to Svc
ML19290C265
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/05/1980
From: Murray T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19290C262 List:
References
LER-79-123-03L, LER-79-123-3L, NUDOCS 8001100445
Download: ML19290C265 (2)


Text

U. S. NUCLE AR RLOULAI UHY (.;Ur.%1#ddivn NRC FORM %G 47-178 ,

LICENSEE EVENT REPORT CONTROL SLOCK: l l l l l l l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6 o 1 0lH l D l B l S !1 :Sl@l 0l 01 -lLICEN34 01 01 Nl Pl F] ~l 0l 25 3l@l426 l1 l1TYPE LICENSE l' l1JG l@l l

$7 CATAd 7 J 9 LICENSEE COJE 14 NUMBER CON'T 0 l1 l0 l 5 l g l e @

?

o i 8

,QCy , l L l@l 0 l 5 l 0 l- l 0 W G1 OCCKET Ny"BER 3 l4 l6 tM Ql1 D3 l2 l0 EVENT l7 OATE l7 l9 74 Q 75 REPORT D ATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h ol2 l At 1618 hours0.0187 days <br />0.449 hours <br />0.00268 weeks <br />6.15649e-4 months <br /> on December 7,1979, a fire was reported in the service water pump room. l 0: I Upon further investigation, operations found that there was no fire but the Service l The 0,4 l Water Pump #3 strainer motor had burned up which generated smoke in the room. l ois lunit was in Mode 5. This occurrence is being reported to document a component failurej O is lThere was no danger to the health and safety of the public or station personnel. The l 0l7 l #3 Service Water Pump and strainer are redundant in the Service Water System. l

' j aes l C.F-33-79-143) .

83 7 6 9 C OY P. VA LV E SYSTEM CAUSE CAUSE CODE CODE SUSCODE COYPONENT CODE SUaCODE SUSCODE jeis lWlAj@ E l@ l A l@ Ml 0l Tl 0j Rl Xj@ l Zl@ l Z l@

13 Id IJ 20 7 8 9 10 11 12 OCCUHaENCE REFORT REVISION SEOUENTIAL REPORT NO. CODE TYPE N EVENTVE4R

@ gtP, LER RO l 7l 9 l-l l ll 2l 3 \/l l 0l 3l 23 29 lLl JJ l_l 31 l

32 l

_ 21 22 23 24 26 27 HOURS 22 08. S PLIE mar tr ACT ER TA ANO CN PL NT ET S S IT E FO IB l-@l34 Al@ l Zi@

l36 Zl@ l0 10 10 l 31 40 l l Yl@

48 l42Y l@ 43 Al@ lW lj 2l Dj@

44 47 JJ A CAusE DESCRIPTION AND CORRECTIVE ACTIONS iio lThe cause of the event was single phasing in breaker BE1280 on Motor Contrcl Center l l1 ) J lE12C. The cause of the single phasing is still being investicated. Breaker BE1280 l ji 12 3 lwas repaired on December 12, 1979 and placed back into service. The motor is pre- l i,3 l sently being repaired. l I

i 4 I 80 7 8 9 ST US  % POWE R OTHER STATUS DISCOV Y DISCOVERY DESCRIPTION Smoke generated by motor

.[ t 5 Clh l0l0l0l@l NA l lAl@l l ACTIVITY CO TENT OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE

' i I NA l 7

6 RELEASE 8 9 LzJ 10

@D LZJ@l n tt 44 45 80 PERSONNEL EXPOSURES NU"8ER TYPE DESCRIPTION -

t 7 0 Z NA l 00 PERSOrtNENINjupiES P NUY9ER h h l h

C ES CR ? # TION

,U [. @ p h 3[' l

_ IT1Iol0101@l NA a R l 51

~" " uu u UU U m 80 7 8 9 11 12 LOSS OF CR DAVAGE TO F ACILITV TV'E DESCRI* TION i

7 i 9 d 9 I ZI@l n to

,y

_NRC USE ONLY ,

iSSU E DESCRIPTION M  !  !!!!!!!!!! !!

68 69 40 ;

7 5 ? 10 DVR 79-188 . Tames P. Rudolph PHONE:

S NWE OF PREPARER 8001100 W5~ '.

TOLEDO EDIS0N COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-143 DATE OF EVENT: December 7, 1979 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Service Water Pump #2 Strainer Motor inoperable Conditions Prior to Occurrence: The unit was in Mode 5, with Power (hWT) = 0, and Load (Gross MWE) = 0.

Description of Occurrence: At 1618 hours0.0187 days <br />0.449 hours <br />0.00268 weeks <br />6.15649e-4 months <br /> on December 7, 1979, a fire wa- reported in the service water pump room. Upon further investigation, operations found that there was no fire but the Service Water Pump #3 strainer motor had burned up which generated smoke in the room.

This occurrence is being reported to document a component failure. Technical Speci-fication 3.7.4.1 requires that two independent service water loops be operable in Modes 1 through 4. Since the station was in Mode 5, no action statement was entered.

Designation of Accarent Cause of becurrence: The apparent cause of the event was single phasing in breaker BE1280 on Motor Control Center (MCC) E12C. The cause of the single phasing is still being investigated.

Analysis of Occurrence: There was no danger to the health and safety of the public or to station personnel. The #3 Service Water Pump and strainer areredundant in the Service Water System. Also since the unit was in Mode 5, the affected service water string was not required.

Corrective Action: Breaker BE1280 was repaired under MWO 79-3724 on December 12, 1979 and placed back into service. The motor is presently being repaired under Maintenance Work Order 79-3724. The cause of single phasing in BE1280 is being investigated under the same maintenance work order.

Failure Data: There have been no previous similar reportable occurrences.

LER #79-123 1727 247

.