ML19290C062

From kanterella
Jump to navigation Jump to search
Concurs W/Draft 3 Interim Position Re Task A-24,Phase 1. Paragraph 1A-1,Category 1 Should Be Revised to Clarify Method of Adding Margin.Paragraph 1A-2,Category II Needs Clarification Re Usage of Referenced Curve
ML19290C062
Person / Time
Issue date: 06/26/1979
From: Bennett A
Office of Nuclear Reactor Regulation
To: Szukiewicz A
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-24, REF-GTECI-EL, TASK-A-24, TASK-OR NUDOCS 8001090109
Download: ML19290C062 (1)


Text

'

t

/

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D. C. ?0555 g

\\...!../

JUN 2 61979 MEMORANDUM FOR:

A. J. Szukiewicz, Task Manager, A-24 FR0ft:

A. B. Bennett

SUBJECT:

A-24 TASK PLAN, PHASE 1 DRAFT #3 INTERIM POSITION Concurrence to the subject document is granted subject to the following comments:

1.

Para. l A-1, Category 1, second sentence, revise as follows:

Margins (see Section III B) should...used.

Reason: Cla rity.Section III B discusses method of adding margin.

2.

Para.1 A-2,1C3 (Category 1) add the word " complete" in the first sentence:

In lieu...the complete generic envelope shown... curves.

Reason: To clarify that the complete curve should be used for Category 1 applications.

3 1A-2 (Category II). Add parenthetical statement (IEEE 323-1971 portion of the curve)

Reason: To clarify usage of the referenced curve.

4 Para.1C, Category 1, revise the title as follows:

Temperature and Pressure for Main Steam Line Break (MSLB)

Conditions.

Reason:

To define "MSLB" sfg&w A. B. Bennett cc:

S. Hanauer 1730 157 F. Rosa R. Satterfield X Aycock 8001090 \\%

-