Forwards IE Insp Repts 50-445/79-25 & 50-446/79-24 on 791003-04,09-11 & 16-19.No Noncompliance Noted
ML19290C018
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/21/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19290C019 List:
References
NUDOCS 8001090042
Download: ML19290C018 (2)


See also: IR 05000445/1979025

Text

l

C

.

0

UNITED STATEJ

. # "80

/

9'o

NUCLEAR REGULATORY COMMISSION

g

REGloN IV

$ h'L(*.I

-

e

<

3

611 RYAN PLAZA DRIVE, SUITE 1000

3 rg

.;

ARLINGTON TEXAS 7G012

h

-O

p

November 21, 1979

.....

In Reply Refer To:

RIV

Docket No. 50-445 /Rp t.

79-25

50-446/Rpt. 79-24

Texas Utilit.ies Generating Cc 1pany

ATTN:

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Messrs. L. D. Gilbert and L. E. Martin

of our staff during the periods October 3-4, 9-11 and 16-19, 1979, of activities

authorized by NRC Construction Permits No. CPPR-126 and 127 for the Comanche Peak

facility, Units No. I and 2, and to the discussion of our findings with Mr. R. G.

Tolson and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

encinsed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of the inspection, no items of noncompliance were identified.

One new unresolved item is identified in paragraph 4 of the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such infor.ution be withheld from

public disclosure.

The application must include a full statement of the

reasons why it is claimed that the information is proprietary.

The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

1732 043

0 42

8001090

w

.

.

Texas Utilities Cencrating

Company

2

November 21, 1979

Should you have any questions concerning this 11spection, we will be pleased to

discuss them with you.

Sincerely,

9

/

lAr

'

,

,

+1

a

N

W. C. Sei le, Chief

Reactor Co s ruction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-445/79-25

50-446/79-24

cc: w/ enclosure

Texas Utilities Generating Company

ATTN:

Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201

~