ML19290B975
| ML19290B975 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/08/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| References | |
| IEB-79-02, IEB-79-2, NUDOCS 8001090002 | |
| Download: ML19290B975 (1) | |
Text
CENTRAL FILES PDR:HQ UNITE D STATES LPD
& '.[p aeco,%,x NUCLEAR REGULATORY COMMISSION REcioN iv UbIC
- -u
. ~I 611 RY AN PLAZA DRIVE, SUITE 1000 h
'l*d T*j(2*'[. 5 ARLINGTON, TEX AS 76012 o
g.,h'.N,/[
o %.edi i.
!3
% ~ ~.,9 4 y November 8, 1979 9,,,.*
Dacket Nos.
50-313 50-368 Arkansas Power and Light Company ATTN:
Mr. William Cavanaugh III Vice President of Generation and Construction P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
Enclosed is IE Bulletin No. 79-02, Revision No. 2 which requires action by you with regard to your power reactor facilities with an operating licease or a construction permit.
Should you have any questions regarding this Bulletin Revision or the actions required by you, please contact this office.
Sincerely, Karl V. Seyfrit Director
Enclosures:
1.
IE Bulletin No. 79-02, Revision No. 2 2.
List of IE Eulletins Issued in Last Six Months cc:
James P. O'Hanlon, Plant Manager Arkansas Nuclear One P. O. Box 608 1729 064 Russellville, Arkansas 72801 O
8 0 01 0 9 0 c>o z._
4 UNITED STATES SSINS No.:
6820 NUCLEAR REGULATORY COMMISSION Accession No.:
OFFICE OF INSPECTION AND ENFORCEMENT 7908220136 WASHINGTON, D.C.
20555 IE Bulletin No. 79-02 Revision 2 Date: November 8, 1979 Page 1 of 7 PIPE SUPPORT BASE PLATE DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS Description of Circumstances:
Inspection experiences and the review of licensee response have identified several R2 areas where the Bulletin intent has not been adequately addressed by licensees.
R2 Revision No. 2 of the Bulletin is intended to clarify the intent of the Bulletin R2 and establish the NRC positions on minimum factors of safety, anchor bolt preload, R2 and the expected date of completion for certain Bulletin actions.
R2 Since the issuance of IE Bulletin No. 79-02 on March 8, 1979, IE inspection R1 experience and many inquiries from licensees indicate that additional informa-R1 tion and clarification is needed.
This revision is intended to serve that R1 purpose.
None of the requirements of the original Bulletin have been deleted, R1 and the due date for completion of the requested actions (July 6, 1979) has R1 not been changed. The following text supersedes the text of Bulletin No. 79-02.
R1 Changes from the original text are identified by R1, R2 in the margin. The pur-R2 pose of this revision is to identify acceptable ways of satisfying the Bulletin R1 requirements.
R1 While performing inservice inspections during a March-April 1978 refueling outage at Millstone Unit 1, structural failures of piping supports for safety equipment were observed by the licensee.
Subsequent licensee inspections of undamaged supports showed a large percentage of the concrete anchor bolts were not tightened properly.
Deficiency reports, in accordance with 10 CFR 50.55(e), filed by Long Island Lighting Company on Shoreham Unit 1, indicate that design of base plates using rigid plate assumptions has resulted in underestimation of loads on some anchor bolts.
Initial investigation indicated that nearly fifty percent of the base plates could not be assumed to behave as rigid plates.
In addition, licensee inspection of anchor bolt installations at Shoreham has shown over fifty percent of the bolt installations to be deficient.
][}g Q6}
Vendor Inspection Audits by NRC at Architect Engineering firms have shown a wide range of design practices and installation procedures which have been employed for the use of concrete expansio are toward more rigorous control.
bolts.
DUPLICATE DOCUMENT The data available on dynamic te:
fatigue failures can occur at lo-Entire document previously entered into system under:
R1 and R2 - Identifies those add' q
g gl
.. t)g ANO l
h
/t No. of pages: