ML19290B837

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-23, Motor Starters & Contactors Failed to Operate. No Written Response Required
ML19290B837
Person / Time
Site: 05000580, 05000581
Issue date: 11/26/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mcwhorter R
OHIO EDISON CO.
References
NUDOCS 7912140223
Download: ML19290B837 (1)


Text

b

/

'o, UNITED STATES l 'i 3.. cf)' %

NUCLEAR REGULATORY COMMISSION 3

O #.#E REGION 111

)

799 ROOSEVELT ROAD g, ' O,#

GLEN ELLYN ILLINolS 60137 Docket No. 50-580 Docket No. 50-581 h0V Z 0 The Ohio Edison Company ATTN:

Mr. R. J. McWhorter Vice President Engineering 76 South Main Street Akron, OH 44308 Gentlemen:

The enclosed IE Circular No. 79-23 is forwarded to you for your infor-mation. No written response to this circular is required.

If you have any questions related to the subject, please contact this office.

Sincerely, sh

~

JJames G. M Kep er Director

Enclosure:

IE Circular No. 79-23 cc w/ encl:

Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TC Harold W. Kohn, Ohio Power Siting Commission 1574 018 79mj an z2 3

SSINS No.-

6830 1

Accession No.

7910250496 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON. D.C.

20555 November 26, 1979 IE Circular No. 79-23 MOTOR STARTERS AND CONTACTOR$ FAILED TO OPERATE Gould, Inc., Electrical Products Group, reported to the NRC on September 11, 1979 potential defects in certain NEMA size 3, Starters and Contactors.

A possible binding or soisure of the carrier assembly, within the support plate of the stationary contact assembly, is caused by an undersized dimension of the support legs.

Starters and contactors with date code 7822 to 7935, model and terial numbers A10, All, A12, A13, A14, A20, A21, A22, and P10 are involved.

Faulty units were manufactured and distributed between June 1, 1978 and August 30, 1979.

The attached listing of nuclear plants, which have received some of this motor control equipment, represents a preliminary check of shipment records.

This listing, however, may not be complete.

Gould, Inc., will recall uninstalled items for retrofit and has retrofit kits available for field installation.

Based on the above, licensees are advised to verify all motor starter and contactor shipments received from Gould, Inc., between June 1, 1978 and August 30, 1979, and assure that applicable model and serial number components are corrected by retrofit and subsequent electrical operation tests.

No written response to this Circular is required.

If you desire additional information regarding this matter, contact the Director of the appropriate NRC Regional Office.

Enclosures:

1.

List of Plants That May Have Received Defective Starter or Contactors 2.

List of Currently Issued IE Circulars DUPLICATE DOCUMENT ]}[f

}]}

Entire document previously entered into system under:

ANO h

h, No. of pages: