Action Control Form CDR 178 Re Request for Evaluation of Technical Adequacy of Corrective Action & Final Resolution of Deficiency Discovered During de-energizing of Power Covering Wetting of Bldg Spray Pumps BS-P-1A & Bs-P-1B
ML19290A478
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/23/1973
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19290A476 List:
References
CDR-178, NUDOCS 7911070652
Download: ML19290A478 (1)


Text

.

J. P. O'Reilly, RO:I FS&E3 ACTION C T ROL FORM A.

Action Code CDR #178 Name of Licensee and Facility lletropolitan Edison Co. (Three f4ile Is1. 1)

Docket No. or License No.

50-289 Title Wetting of building spray pumps BS-P-1 A & IB Origin _ utility Date Rec'd 10/11/73 B.

FS&E3 3 ranch Coordinator:

Bryan Dreher X

Ellis Paulus I

f complet, ion Requested by i

[

C.

Action Requested of:

8 ADREMP M&PP03 EP3 RPB ADCO OB CB TAB OOE Region I

Date Requested 10/23/73 Completion Requested by Routine handling i

Reference CDR dated 10/4/73 from'the utility to D. F. Knuth D.

Action Requested In accordance with PI 0600/6," Construction Deficiency Reporting" the Metropolitan Edison Company report' of 10/4/73, covering the wetting of the building spray pumps BS-P-1 A & 18, is being assigned to Region I for evaluation of technical adequacy of the corrective action being taken and final resolution of the deficiency.

E.

Date Action Completed Close-out (Date & Method)

Co==enta:

If completion date is not consistent with your work schedule, please.let us know.

si jl 155L 354

,p -

,.,. '_ i ;)

L--

$ G. Davis, Deputy Director for Field Operations Directorate of Regulatory Operations 7911070 h 2

.