Action Control Form CDR 158 Re Request for Evaluation of Technical Adequacy of Corrective Action & Final Resolution of Deficiency Discovered in Electrical Conduit Seismic Hangers
ML19290A469
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/30/1973
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19290A466 List:
References
CDR-158, NUDOCS 7911070644
Download: ML19290A469 (1)


Text

R0:I J.P.0'Reilly FS6EB ACTION CONTEOL FORM CDRdl58 A.

Action Code Metropolitan Edison Co. (Three Mile Island i Name of Licensee and Facility Docket No. or License No.

50-280 Title Electrical Conduit Seismic Hancer Deficiencies Origin Licensee Date Rec'd 8/28/73 B.

FS&EB Branch Coordinator:

Bryan Dreher X

Ellis Paulus Complet, ion Requested by C.

Action Requested of:

ADREv2 M&PP03 EPB RPB ADC0 03

. CB TAB OOE Region I

Date Requested 8/30/73 Completion Requested by Reference CDR dated 8/20/73 from above licensee.

D.

Action Requested I

In accordance with PI 0600/6, " Construction Deficiency Reporting," the Metropolitan Edison Company report of 8/20/73, cover Electrical Conduit Seismic Hanger Deficiencies, is being assigned to Region I for evaluation of technical adequacy of the corrective action being taken and final resolution of the deficiency.

E.

Date Action Cocpleted i

{

Close-out (Date & Method)

Cor=ents: If completion date is not consistent with your work schedule, please let us know.

1557 342

/

cLt,cQ,,C'MLdre J. G. Davis, Deputy Director for Field Operations t

Direc.: orate of Regulatory Operat_ons i