ML19290A458
| ML19290A458 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/18/1968 |
| From: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| To: | |
| Shared Package | |
| ML19290A457 | List: |
| References | |
| NUDOCS 7911070635 | |
| Download: ML19290A458 (3) | |
Text
.
"[g 5[d
- I UNITED STATES
'ie %
ATOMIC ENERGY COMMISSION I
- W ASW NGTON. O C.
E545 2
- n
- METROPOLITAN EDISON COMPANY (Three Mile Island Nuclear Station)
DOCKET No. 50-289 PROVISIONAL CONSTRUCTION PERMIT Construction Permit No. CPPR-40 1.
Pursuant to 8 104 b. of the Atomic Energy Act of 1954, as amended (the Act),
and Title 10, Chapter 1, Code of Federal Regulations, Part 50, " Licensing of Production and Utilization Facilities," and pursuant to the order of the Atomic Safety and Licensing Board, the Atomic Energy Commission (the Commission) hereby issues a provisional construction permit to Metropolitan Edison Company (the applicant) for a utilization facility (the facility),
designed to operate at 2452 megawatts (thermal), described in the applica-tion and amendments thereto filed in this matter by the applicant and as more fully described in the evidence received at the public hearing upon that application. The facility, known as the Three Mile Island Nuclear Station will be located at the applicant's site on Three Mile Island, an island in the Susquehanna River, in Londonderry Township, Dauphin County, Pennsylvania.
2.
This permit shall be deemed to contain and be subject to the conditions specified in il 50.54 and 50.55 of said regulations; is subject to all appli-cable provisions of the Act, and rules, regulations and orders of the Commis-sion now or hereaf ter in ef fect; and is subject to the conditions specified or incorporated below:
A.
The earliest date for the ccmpletion of the facility is December 1,1970, and the latest date for completion of the facility is December 1,1971.
B.
The facility shall be constructed and located at the site as described in the application, as amended, on Three Mile Island, Londonderry Township, Dauphin County, Pennsylvania.
C.
This construction permit authorizes the applicant to construct the facility described in the application and the hearing record in accordance with the principal architectural and engineering criteria set forth therein.
3.
This permit is provisional to the extent that a license authorizing operation of the facility will not be issued by the Commission unless (a) the applicant submits to the Commission, by amendment to the application, the complete 1557 330 07 0 $M 5911
2-final safety analysis report, portions of which may be submitted and evaluated from time to time; (b) the Commission finds that the final design provides reasonable assurance that the health and safety of the public will not be endangered by the operation of the facility in accordance with procedures approved by it in connection with the issuance of said license; and (c) the applicant submits proof of financial protectien and the execution of an indemnity agreement as required by 8 170 of the Act.
FOR THE A?rMIC ENERGY COMMISSION er:pr.el sigud by
r Y:rr.s Peter A. Morris, Director Division of Reactor Licensing Date of Issuance: MAY 181568 1557 33I
N
)
eg.640J y
- k *
- REACIOR DATA INPUT FORM
+r Control # 1h33 A.
IDENTIFYING & DESCRIPTIVE DATA REACTORS i
as...
i2.P.0s.
v 2. co C. c r
,0.
o..>.s.
vo.TvPc 0F
.t.CTO.
ii.Ct.ss or
.E.CTO.
' 211 50-289 Pressurized Water loh I
- APPL 1 CANT i9.NAur GF REACTOR Metropolitan Edison Campany "hree Mile Island I
- ss a m mesm e s
, *. s T a t t f. eu i t o i N o POWER LEVEL g
I P.O. Box 5h2 f
,t uNif
.E0ursico oesisN g
.uf 0.irio
.s.
.T.
go.
1..CiTv n.sfait so. zip EIIC.
MW 8h5 071 I
Reading Pa 19603 7i.
"72-
'I1IER.
Megav 2h52 2535 8
B.
ACTION DATA BASIC PROGSSING STAGES F,j//f
/
/.V ' /
"/nti't,*[.' W s,o.,
aCTiv.Co.
74
/
ri.sf.CTicN v..
0.
o.y
(/
/
PRE-APPLICATIm v..
0.
o.,
CONSIDERATICN
,f,/
I g".. M fMM!? %1"'Ts"3"
.PP6.C..EC.
v a.
=0 oav
- 32. v =.
w o. u.y 7
j PROCESSING APPLICA.
35 B
T T.T..
u 0.
o.,
taftsT 67 05 03 I*o. & / b /o N O' d' co"
o^'t
/2 d/
FOR CCNSTRUCTION i
l STARTED
,8 PaoV.
OP.
AuTMORITv Issuto 3h v4 M 0.
oAv npours.
. o. v a. ua o. ys...
.i, v s 0.
o,Y c,,,,,T,0N IONAL 36 g,0.
PROCESSING g
o^ TE OPERATING sr..Tts root To.
.u
. isuto AUTilORITY LL
' 'l '
I i
l SUPPLEMENTERY
,,, ION ACT o.
.T.,,
N o.
v
- 0. o.v E. T.
v..
0.
o.v
! Mau t as o Tc suPPLt.
bbb l
oate ruPPoturNTear atoursT l'
0
atours? =cC a I
<T a s,3 CouPLefro l
I 4A Pu= Post or.coutsT4rasa, gs4 atsuLT or T s a uu. N o.. C M N a t N a. t T u i
E I C.
STATISTICS
" " "I sz.
4 g s i.
voto INPUT ENTERio UNotR Coot! IN TYPE OF ACTION REQUESTED AND TAKEN
. c o. I T...
F 1 (L D s 01 03 OR 12 aNo 09 as REcoROEo ABovt ANo ACTivlTV l
4 i #EACTO# CONCEPT afvtte CODE i
G l PetLIMINARv slTE AtVite C
l P e t CON s T RuC TION sfaGE atytte g_
s3 o l C O N s t il.J C T I O N PitulT(C.P.REvits)
IE y C04s0Lloatt INPur ENTsato uNota E
I AUTMORfTv TO OPteAtt(0P.s1 AGE Rtylts)
E Coces iN Pittas 08 03 Ca 12 aNo F
l auTMontTV TO Possess ONLY Os as etC0 Roto ABCVE ANo I
l G
l AMEN 04fmf 70 ComsTRUCTt0N PfmWit ACTly1TV Coot
- 1TH H
l 4W E N OWE N T ?O OPERATING LICf4sf
oG*
PROJ*
i l CHANGE 70 TECMNICAL $PECIFICAfl0Ns y
T A sM ACT-E.t..
10N I
E I CONsTauCTlom Pituli tuTENsl04 l
l I
L 1 OPreaTiNo tiCENscion aufw0=iTvitvTENsiON I
l t u i
0.t 0 0E.
I l
l N
1 :PiclaL AUTH000Tv l
l l
v l L actNst(o n auf we n e fvl TE mu t ma tt o on tvPlate l
l I
t w
L i e i e~retrx.tatN i i
E l
l l
l l
l