Forwards IE Insp Rept 50-320/79-13 on 790515-0612. Significant Insp Finding 50-320/79-13-02 Re Failure to Post, Barricade or Control Access to High Radiation Areas Encl
ML19290A172
Person / Time
Site: Crane 
Issue date: 08/06/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19290A173 List:
References
NUDOCS 7910170500
Download: ML19290A172 (4)


See also: IR 05000320/1979013

Text

=

.

M

.

.

gog

UNITED STATES

'

g

jo

NUCLEAR REGULATORY CoMMisslON

e

g

REGION I

$ ., ,

g

$31 PARK AVENUE

hq;

,

f

KING OF PRUS$1 A PENNSYLVANIA 19406

%' .'.u y

...

AUG

6 1979

Docket No. 50-320

4

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice Presidt:nt - Generation

P. O. Box 542

ReaJing, Pennsyivania

19640

Gentlemen:

Subject:

Inspection No. 50-320/79-13

.

This refers to the inspection conducted during the period from May 15

through June 12, 1979 by personnel from the IE Resident Office at Three

. Mile Island of activities authorized by the NRC and to the discussions

of our findings held by the Chief, IE Resident Office with Mr. J. Logan

and other members of your staff on May 25, 1979 and June 15, 1979.

Areas examined during this inspection period are described in the Office

of Inspection and Enforcement Inspection Report which is enclosed with

this letter. Within these areas, the inspection activities consisted of

selective examinations of procedures and representative records, interviews

with licensee and contractor personnel, measurements made by the inspectors,

and observations by the inspectors.

NRC personnel provided 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day

inspection coverage on site during this period.

NRC concerns identified during this inspection period were relayed to

management personnel in your organization when those concerns were

identified.

Corrective actions were adjudged adequate for the time

period available to respond to those concerns and additional enforcement

measures are therefore not being taken at this time.

Further details on

the items involved are contained in the enclosed inspection report

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any infomation that you (.or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such infonnation

from public disclosure.

Any such application must be accomrianied by an

affidavit executed by the owner of the infonnation, which icentifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the itams which will be

. considered by the Commission as listed in subparagraph (b) (4) of Section

-

2224

017

.

.

79101705to

.

.

.

.

AUG

B 1979

Metropolitan Edison Company

2

.

2.790. The information sought to be withheld shall be incorporated as

far as possible into a seoarate part of the affidavit.

If we do not

hear from you in this recard within the specified period, the report

will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/

.

!

Bo e H. Grier

Director

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-320/79-13

cc w/ encl:

E. G. Wallace, Licensing Manager

..

J. J. Barton, Project Manager

R. C. Arnold, Vice President - Generation

L. L. Lawyer, Manager - Generation Operations

G. P. Miller, Manager - Generating Station - Nuclear

J. B. Logan, Unit 2 Superintendent

G. A. Kunder, Unit 2 Superintendent - Technical Support

I. R. Finfrock, Jr.

Mr. R. Cunraa

G. F. Trowbridge, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(.Without Report)

.

_

.

2224

018

.

'

.

APPENDIX A

Metropolitan Edison Company

Docket No. 50-320

Significant Inspection Finding 50-320/79-13-02

Failure to Post, Barricade or Control Access to High Radiation Areas

1.

The following areas emanated whole body dose rate greater than 1000

mrem /hr and were either not controlled (i.e., locked doors or manning)

to prevent unauthorized entry and/or not posted and barricaded as

required by Technical Specification 6.12.

Whole Bcdy Dose

Date

Area

Rate (mrem /hr)

5/24/79

Unit 2 - Auxiliary Bldg.

281' el - Make up Primp Room B

20000

- Spent Resin Transfer

20000

Pump Area (Barrel Storage)

(Access not Controlled)

328' el - Boric Acid Mix

3000

Tank Area

(Access not Controlled)

305' el - Area Near

5000

HP-R-227

(Access not Controlled

and not porMd)

5/28/79

Unit ? - Auxiliary Bldg.

281' el - South Door to Bleed Tank

106

A ea

(Not Posted)

,

,

- Make up Pump Room

20000

"A"

(Not Posted)

- Make up Pump Room

20000

"B"

(Access not Controlled)

- Make up Pump Room

5000

_

"C"

ccess not Controlled)

.

Appendix A

2

Whole Body Dose

Date

Area

Rate (mrem /hr)

5/28/79

305' 31 - Intermediate

1000-4000

Cooling Pump Area

(Not Posted)

6/4/79

Unit 2 - Auxiliary Building

281' el - Area between Containment

5000

and Fuel Handling Bldg.

(Access not Controlled

and not Posted)

South Door

106

-

To Bleed Tank Area

(Not Posted)

- Make up Pump Room

20000

"A"

(Not Posted)

- Make up Pump Room

20000

"B"

(Access not Controlled)

Make up Pump Room

70000

-

"C"

(Not Posted)

305' el

Area near

5000

HP-R 227

(Access not Controlled)

,

o

2224

020

-

.