ML19289F918
| ML19289F918 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/11/1979 |
| From: | Jay Collins Office of Nuclear Reactor Regulation |
| To: | Rusche B METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 7906210136 | |
| Download: ML19289F918 (1) | |
Text
.
hk o *tCo f
n s
UNITED STAT Es j
c
-; '.y
_,,7 1 NUCLE AR REGULATORY COMMISSION r
N.3 s.,
O W AsHINGTCN. D. C. 20555
~ t %x m-
%=? % A [ !
- s,
Ben Rusche, Meted FR0"-
John T.
Col 1 ins, NRC SU5 JECT:
EFFI CI ENCY TESTI NG OF CHARCCAL FI LTUTI ON SYSTE.M5 The charcoal 'ilt ation systens in coeratirn at TMI ~', which are being used to reauce tne radiciodine e'fluents shall te testec 'or iodine removal e#'iciency at least once per 720 nours o' oceration-The systems in reference incluce the Aus Building, Fuel Pcndling Building, Supplementary Air Flow Systen, and the Condenser Evacuation S y s t r.m.
This schedule of testing shall be continued until more fornal requirements are' imple,ented which are expected to take the form o' 50ecia! Tecnnical Specifications covering the recovery operation et TMI-C.
The o,ce ce-720 hours testing frequency vicids ne following first test cate for these svstems:
Fil tration Svete, Test Date Aux Bu i l d i ng
A" 5/19 Aux Building "B" 5/23 Fuel Handling Building "A" 5/22 Fuel Handling Building "B' Supplementary System A, B,
C, and D Condenser Esacuation System 5/20
- Since this systen has not been changed out, the testing schedule should be establ:shed based on the schedule change out date.
"Since each of these trains have not been ooerating in a ccotinucus e
mode, testir.g schedules shall be established based on actual operating tines beginning May lb, 1979 kst.SW <
a John T.
Col 1 ins, NRC p
,, % p ph 7 " _' p.,l u-
-N@/M h, h[. '2.3 d,'
cc:
R.
A r n c l ::, h e t Ed 9'
' N. i q$,,p h 96Wsh, (W
"" '"iP.h J.
McConnell, Met:d
,y
- 4 ;th, NR-g se -
ej 7 9 0 6 21cm 242 25Z Sh %
P
-