Forwards IE Insp Repts 50-289/79-08 & 50-320/79-07 on 790319-23 & 26.No Noncompliance Noted
ML19289F828
Person / Time
Site: Crane  Constellation icon.png
Issue date: 04/20/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19289F829 List:
References
NUDOCS 7906200334
Download: ML19289F828 (2)


See also: IR 05000289/1979008

Text

.

M

  1. "

J

UNITED STATES

fy

A

NUCLEAR REGULATORY COMMtsslON

p . ,, ,

.f, < s g jj

' ' ' E

REGION I

,

esiPanx avsNuc

,

I'

f

KING OF PRUS$1 A, PENNSYLVANI A 19406

% . . .j..

Docket Nos. 50-289

AfR 2 0 ?373

50-320

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President

P.O. Box 542

Reading, Pennsylvania 19640

Gentlemen:

Subject: Combined Inspections 50-269/79-08 and 50-320/79-07

This refers to the inspection conducted by Mr. D. Haverkamp of this

office on March 19-23 and 26, 1979, at Three Mile Islanc' Nuclear Sta-

tion, Units 1 and 2, Middletown, Pennsylvania, of activities authorized

by flRC License Nos. DPR-50 and DPR-73 and to the discussions of our

findings held by Mr. Haverkamp with Messrs. J. Logan and J. Seelinger

of your staff on March 23, 1979 and with Mr. Seelinger of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the fiRC's Public Document

Room.

If this report contains any infomation that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

infomation from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and which

contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subpara-

graph (b)(4) of Section 2.790.

The infomation sought to be withheld

shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the spec-

ified period, the report will be placed in the Public Document Room.

2.5T

7906200 3.3

G

gg

% B1

.

Metropolitan Edison Company

MR 2 01973

2

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

__

-

El, o,

. Brunner, Chief

Reactor Operations and Nuclear

@'pport Branch

Enclosure: Office of Inspection ana Enforcement Combined Inspection

Report Numbers 50-289/79-08 and 50-320/79-07

cc w/ encl:

E. G. Wallace, Licensing Manager

J. J. Barton, Project Manager

R. C. Arnold, Vice President - Generation

L. L. Lawyer, Manager - Generating Operations

G. P. Miller, Manager - Generating Station - Nuclear

J. L. Seelinger, Unit 1 Superintendent

W. E. Potts, Unit 1 Superintendent

Technical Support

J. B. Logan, Unit 2 Superintendent

G. A. Kunder, Unit 2 Superintendent - Technical Support

I. R. Finfrock, Jr.

Mr. R. Conrad

G. F. Trowbridge, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

236 26TO