ML19289F828
| ML19289F828 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/20/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Herbein J METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19289F829 | List: |
| References | |
| NUDOCS 7906200334 | |
| Download: ML19289F828 (2) | |
See also: IR 05000289/1979008
Text
.
M
- "
J
UNITED STATES
fy
A
NUCLEAR REGULATORY COMMtsslON
p . ,, ,
.f, < s g jj
' ' ' E
REGION I
,
esiPanx avsNuc
,
I'
f
KING OF PRUS$1 A, PENNSYLVANI A 19406
% . . .j..
Docket Nos. 50-289
AfR 2 0 ?373
50-320
Metropolitan Edison Company
ATTN: Mr. J. G. Herbein
Vice President
P.O. Box 542
Reading, Pennsylvania 19640
Gentlemen:
Subject: Combined Inspections 50-269/79-08 and 50-320/79-07
This refers to the inspection conducted by Mr. D. Haverkamp of this
office on March 19-23 and 26, 1979, at Three Mile Islanc' Nuclear Sta-
tion, Units 1 and 2, Middletown, Pennsylvania, of activities authorized
by flRC License Nos. DPR-50 and DPR-73 and to the discussions of our
findings held by Mr. Haverkamp with Messrs. J. Logan and J. Seelinger
of your staff on March 23, 1979 and with Mr. Seelinger of your staff
at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the fiRC's Public Document
Room.
If this report contains any infomation that you (or your con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such
infomation from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information,
which identifies the document or part sought to be withheld, and which
contains a statement of reasons which addresses with specificity the
items which will be considered by the Commission as listed in subpara-
graph (b)(4) of Section 2.790.
The infomation sought to be withheld
shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the spec-
ified period, the report will be placed in the Public Document Room.
2.5T
7906200 3.3
G
gg
% B1
.
Metropolitan Edison Company
MR 2 01973
2
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
__
-
El, o,
. Brunner, Chief
Reactor Operations and Nuclear
@'pport Branch
Enclosure: Office of Inspection ana Enforcement Combined Inspection
Report Numbers 50-289/79-08 and 50-320/79-07
cc w/ encl:
E. G. Wallace, Licensing Manager
J. J. Barton, Project Manager
R. C. Arnold, Vice President - Generation
L. L. Lawyer, Manager - Generating Operations
G. P. Miller, Manager - Generating Station - Nuclear
J. L. Seelinger, Unit 1 Superintendent
W. E. Potts, Unit 1 Superintendent
Technical Support
J. B. Logan, Unit 2 Superintendent
G. A. Kunder, Unit 2 Superintendent - Technical Support
I. R. Finfrock, Jr.
Mr. R. Conrad
G. F. Trowbridge, Esquire
Miss Mary V. Southard, Chairman, Citizens for a Safe Environment
(Without Report)
236 26TO