Informs of Completion of Two Prerequisites for Startup After First Refueling Outage.Longer Term Means of Reactor Overpresurization Protection Have Been Installed
ML19289F680
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/08/1979
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 7906150326
Download: ML19289F680 (1)


Text

.

Alatama Power Corrpany KO Nam 1&h Sreet Post OtSce Box 2641 Birmingnarn. Aiatama 35291

%!ephone 205 323-5341 F. L CLAYTON. JR.

gghggg gyg Senor Vice Pesident tre scanwn e+wn system June 8, 1979 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn:

Mr. A. Schwencer

Dear Mr. Schwencer:

This is to inform you that two conditions of the Joseph M. Farley Nuclear Plant Unit-1 Facility Operating License No. NPF-2, required to be completed prior to unit startup af ter the first refueling outage, have been completed.

These are conditions C(3)(b) and C(3)(e) concerning installation of long term means of reactor overpressurization protection and replacement of instrumentation for measurement of pressurizer level, steam generator wide range level, steam generator narrow range level and the reactor coolant system pressure, respectively.

It is Alabama Power Company's understanding that a license amendment is not required prior to startup after the current refueling outage since the two subject license conditions have been satisfied.

If you have questions please advise.

Yours very truly, 7,

</

-+L g 3ME-f iSD L.' Clayte, Jr #