Forwards IE Insp Repts 50-327/79-20 & 50-328/79-11 on 790326-29.No Noncompliance Noted
ML19289F284
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/10/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19289F285 List:
References
NUDOCS 7906070156
Download: ML19289F284 (2)


See also: IR 05000327/1979020

Text

9

IE Rd

UNITED STATES

{3,j'p y

k8 8800

t

p

9

g

jo,,

NUCLEAR REGULATORY COMMISSION

g

REC:ON11

{

) .73 (

g

101 M ARIETTA STREET.N.W.

  • -

E

I

ATLANT A. GEORGIA 30303

9S

o,

s ..v /

o

...

APR 101979

In Reply Refer To:

RII:CRM

50-327/79-20

50-328/79-11

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this office on

March 26-29, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah I and 2 facilities, and to the discussion

of our findings held with J. E. Wilkins at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in'the

Public Document Room.

2232 279

7906070156

.

APR 101979

,

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

'$

l

'

'

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Briach

Enclosure:

Inspection Report Nos.

50-327/79-20 and 50-328/79-11

cc w/ encl:

J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower 11

Chattanooga, TN 37401

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319}} }gQ J. F. Cox 400 Commerce Street W10C131 C Knoxville, TN 37902 D. L. Lambert, Project Engineer 400 Chestnut Street Tower II Chattanooga, TN 37401 , }}