Forwards IE Insp Repts 50-566/79-05 & 50-567/79-05 on 790313-15.No Noncompliance Noted
ML19289E989
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 04/02/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19289E990 List:
References
NUDOCS 7906010018
Download: ML19289E989 (2)


See also: IR 05000566/1979005

Text

dea

a

UNITED STATES

[pn REcoq'o,

Ob7

NUCLEAR REGULATORY COMMISSION

(

.

..

p

3 9,( [.g

REGION H

"-

101 M AR IE TT A STRE ET. N.W.

,

g

o,

.

[

ATLANT A, GEORGI A 30303

g

v-

s . .v

',

..+

AFR 0 21979

In Reply Refer To:

,

RI P JRif

i

50 ;66/79-05

s-567/79-05

e

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower 11

Chattanooga, TN 37401

Gent lerren :

This refers to the inspection conducted by

J. R. Harris, of this office

on March 13-15, 1979, of activities authorized by NRC Construction Permit

Nos. CPPR-172 and CPPR-173 for the Yellow Creek facility, and to the

discussion of our findings held with M. M. Price at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and. representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of nontompliance were

disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days ta this office to withhold such infor. nation from publtc disclosure

Any such application must include a full stateaent ef the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary informatian identitied in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2233

355

19060100/8

'

APR 0 21979

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

!

I

Sincerely,

/[

'.>

C. E. Murphy, Chief

Reactor Construction and Engineering

.

Support Branch

Enclosure:

Inspection Report Nos. 50-566/79-05

and 50-567/79-05

cc w/ encl:

J. F. Cox

400 Commerce Street

W10Cl31C

Knoxville, TN 37902

M. M. Price, Project Manager

P. O. Box 2000

Iuka, MS 38852

D. L. Terrill, Project Engineer

400 Chestnut Street Tower 11

Chattanooga, TN 37401

2233 356