ML19289E945

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-155/79-04 on 790213-14, 0313 & 26-27
ML19289E945
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/09/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19289E946 List:
References
NUDOCS 7905290554
Download: ML19289E945 (2)


See also: IR 05000155/1979004

Text

4

T

M

f

a

4

UNITED STATES

k

DEyd

NUCLEAR REGULATORY COMMISSION

'

.

5,

hf;( \\ }

REGloN lit

5

.-

'C

799 ROOSEVELT ROAD

%,

g,

j

GLEN E LLYN, ILLINols 60137

f

.....

APR 9 - 1979

-

Docket No. 50-155

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Manager of Nuclear

Plant Operations

212 West Michigan Avenue

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Messrs. K. D. Ward,

K. R. Ridgway and J. J. Harrison of this office on February 13-14

and March 13, 26-27, 1979, of activities at the Big Rock Point

Nuclear Plant authorized by NRC Operating License No. DPR-6

also at the General Electric Office and Service Shop in the

Chicago area, and to the discussion of our findings with

Messrs. T. Bordine, C. Peterson, J. Rang and others of your

staff at the conclusion of the inspections.

The enclosed copy of our inspection report identifies areas

exsmined during the inspection. Within these areas, the

in, action consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

790529055Y

.

.

7

Consumers Power

-2-

APR 9

1979

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

ff]

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure: IE Inspection

Report No. 50-155/79-04

cc w/ encl:

,

Mr. C. J. Hartman, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

W IC

Ronald Callen, Michigan Public

Service Commission

Anthony Roisman, Esq.,

Attorney

3

244

e