Forwards IE Insp Rept 50-336/79-04 on 790220-23.No Noncompliance Noted
ML19289E838
Person / Time
Site: Millstone 
Issue date: 04/10/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19289E839 List:
References
NUDOCS 7905290160
Download: ML19289E838 (2)


See also: IR 05000336/1979004

Text

.,.

Tigh

e# 0%,

UNITED STATES

j

ft

'g

NUCLEAR REGULATORY COMMisslON

.,_R"

iY

"

5 '[g

o

nEcion i

.

,J. f

631 PARK AVENUE

9, fs

1

KING Cc' PRUS$1 A, PENN5YLV ANI A 19406

g

....+

An 10 im

Docket No. 50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice Fresident - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-336/79-04

This refers to the inspection conducted by Mr. R. Zimmerman of this

office on February 20-23, 1979, at Millstone Nuclear Power Station, Unit

2, Waterford, Connecticut, of activities authorized by NRC License No.

DPR-65 and to the discussions of our findings held by Mr. Zimmerman with

Mr. J. Opeka and other members of your staff at the conclusion of the

inspection, and to a subsequent telephone discussion between Mr. W.

Baunack of this office and Mr. Farrell of your staff on March 1,1979.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the

items of noncompliance brought to your attention in letters dated October

16, 1978 and November 2,1978.

We have no further questions regarding

your action at this time.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

204/

?O6

7005290100

.

.

Northeast fluclear Energy

2

p3101313

Company

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room,

flo reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

^

E on J. Brunner, Chief

Rgactor Operations and fluclear

Support Branch

-

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-336/79-04

cc w/ enc 1:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

2047