ML19289E838
| ML19289E838 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/10/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19289E839 | List: |
| References | |
| NUDOCS 7905290160 | |
| Download: ML19289E838 (2) | |
See also: IR 05000336/1979004
Text
.,.
Tigh
e# 0%,
UNITED STATES
j
ft
'g
NUCLEAR REGULATORY COMMisslON
.,_R"
iY
"
5 '[g
o
nEcion i
.
,J. f
631 PARK AVENUE
9, fs
1
KING Cc' PRUS$1 A, PENN5YLV ANI A 19406
g
....+
An 10 im
Docket No. 50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice Fresident - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-336/79-04
This refers to the inspection conducted by Mr. R. Zimmerman of this
office on February 20-23, 1979, at Millstone Nuclear Power Station, Unit
2, Waterford, Connecticut, of activities authorized by NRC License No.
DPR-65 and to the discussions of our findings held by Mr. Zimmerman with
Mr. J. Opeka and other members of your staff at the conclusion of the
inspection, and to a subsequent telephone discussion between Mr. W.
Baunack of this office and Mr. Farrell of your staff on March 1,1979.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the
items of noncompliance brought to your attention in letters dated October
16, 1978 and November 2,1978.
We have no further questions regarding
your action at this time.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
204/
?O6
7005290100
.
.
Northeast fluclear Energy
2
p3101313
Company
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section
2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room,
flo reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
^
E on J. Brunner, Chief
Rgactor Operations and fluclear
Support Branch
-
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-336/79-04
cc w/ enc 1:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
2047
107