ML19289E795

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-277/79-05 & 50-278/79-04 on 790129-0202.No Noncompliance Noted
ML19289E795
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/13/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19289E796 List:
References
NUDOCS 7905290116
Download: ML19289E795 (2)


See also: IR 05000277/1979005

Text

e#

%

UNITED STATES

y

$

NUCLEAR REGULATORY COMMISSION

I

O

"

'

REGION I

'd kR ti

f

niNG OF PRUSSIA, PENNSYLVANI A 19404

,

....+

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania

19101

Gentlemen:

Subject: Combined Inspection 50-277/79-05 and 50-278/79-04

This refers to the inspection conducted by Mr. E, G. Greenman of this

office on January 29 - February 2,1979 at Peach Bottom Atomic Power

Station, Units 2 and 3 of activities authorized by NRC License Nos. DPR-

44 and DPR-56 and to the discussions of our findings held by Mr. Greenman

with Mr. W. T. Ullrich of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspectior, and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selettive

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Mas of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclose.. inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

f.ijl/

J3<3

..

i

790520011G

.

.

Philadelphia Electric Company

2

MR 131373

No reply to this le:.ter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

o_

El op J. Brunner, Chief

Reagtor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Combined Inspection

Report Numbers 50-277/79-05 and 50-278/79-04

cc w/ encl:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Warren Rich, Esquire (Without Report)

JU47.)36