ML19289E791

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/79-09 on 790320-23.No Noncompliance Noted
ML19289E791
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/05/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19289E784 List:
References
NUDOCS 7905290112
Download: ML19289E791 (2)


See also: IR 05000395/1979009

Text

.

.

f

.*

'

[

%

nuca.4nr c

"MMISSION

'

'

-

e

k

1

.S

C E ET, N.W.

101 M ARI

.

ATLANTA, GEORGIA 30303

[

%*****y

APR

5 1979

In Reply Refer To:

RII:TDG

50-395/79-9

South Carolina Electric and Gas Company

ATTN:

M. C. Johnsor., Vice Preside:.t

Special Se: vices and Purchasing

P. O. Box 764

Columtia , S C 29218

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office on

March 20-23, 1979, of activities authorized by NRC Construction Permit No.

CPPR-94 for the V. C. Summer Nuclear Plant, and to the discussion of our

findings held with C. Moore at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any infortration that you (or your contractor) believe to be

proprietary, it is necessary that you make a wri*.ien application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is c: aimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2047

016

~D05290//2

9

.

.

.

.

6

South Carolina Electric and

APR 0 51979

Gas Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

A

C. E. iurphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

Inspection Report No.

50-395/79-9

cc w/ enc 1:

T. B. Conners, Jr.

Conners, Moore and Corber

1747 Pennsylvania Avenue, N. W.

Washington, D C 20006

A. A. Smith

Quality Assurance

P. O. Box 8

Jenkinsville, S C 29065

O. S. Bradham, Manager

Nuclear Opes tions

P. O. Box 8

Jenkinsville, SC 29065

204/

Jl/