Forwards IE Insp Rept 50-271/79-01 on 790103 & 04.No Noncompliance Noted
ML19289D810
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/26/1979
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML19289D811 List:
References
NUDOCS 7903140481
Download: ML19289D810 (2)


See also: IR 05000271/1979001

Text

7WA

.

..

- A m ,.

.

M

%

UNITED STATES

y g)

'g

NUCLEAR REGULATORY COMMISSION

% i

o

REGION I

  • h

[f

631, ARK AVENUE

Jg .;

xina or caussia, esunsvevania i,4os

+....

Docket No. 50-271

JAN 2 61979

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. R: Sert H. Groce

Licensing Engineer

20 Turnpike Road

Westborough, Massachusetts 01581

Gentlemen:

Sub, ject:

Inspection 50-271/79-01

This refers to the inspection conducted by Mr. R. Summers of this office

on January 3-4, 1979, at Vernon, Vermont and Westborough, Massachusetts

of activities authorized by NRC License No. DPR-28 and to the discussions

of our findings held by Mr. Summers with Mr. W. Conway of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from pu'lic disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

790314043(

,

-

.

,

Vermont Yankee Nuclear Power Corpora' ion

'

2

JAM 2 S 1979

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

alter G. Martin, Chief

Safeguards Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-271/79-01

cc w/ encl:

W. F. Conway, Plant Superintendent

S. D. Karpyak, Manager, Administrative and Technical Liaison

K. Kniskern, Manager of Security

A. Soucy, Assistant Treasurer

A. Z. Roisman, Natural Resources Defense Council (Without Report)