ML19289D693

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-277/78-31 & 50-278/78-34 on 781127-30 & 781218-22.No Noncompliance Noted
ML19289D693
Person / Time
Site: Peach Bottom  
Issue date: 02/01/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19289D694 List:
References
NUDOCS 7903140139
Download: ML19289D693 (2)


See also: IR 05000277/1978031

Text

fn' arai

UNITED STATES

gg

,

-t

NUCLEAR REGULATORY COMMisslON

y

l

j

,

REGION 1

"g

$31 PARK AVENUE

KING OF PRUSSI A. PENNSYt.V ANI A 19406

1 FEB 1979

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President, Electric Production

2301 Market Street

Philadelphia, Pennsylvania

19101

Gentlemen:

Subject:

Inspection 50-277/78-31, 50-278/78-34

This refers to the inspection conducted by Mr. E. G. Greenman of this

office on November 27-30, and December 18-22, 1978, at Peach Bottom

Atomic Power Station, Units 2 and 3, Delta, Pennsylvania, of activities

authorized by NRC License Nos. DPR-44 and DPR-56 and to the discussions

of our findings hild by Mr. Greenman with Mr. W. Ullrich at the conclusion

of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

7 9 0 314 01 M

i ; i; a . . 9

'

Philadelphia Electric Company

2

1 FEB 1979

-

,

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

l7y_=

e ~

(ld

E

J. Brunner, Chief

Rea tor Operations and Nuclear

Support Branch

Enclosure:

Office of Inspection and Enforcement Combined Inspection

Report Number Nos. 50-277/78-31 and 50-278/78-34

cc w/ encl:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Warren Rich, Esquire (Without Report)