Forwards IE Insp Rept 50-537/78-01 on 781201.No Noncompliance Noted
ML19289D018
Person / Time
Site: Clinch River
Issue date: 12/18/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT
Shared Package
ML19289D019 List:
References
NUDOCS 7901290115
Download: ML19289D018 (2)


See also: IR 05000537/1978001

Text

e

'I37

k' "8 4

UNITED STATES

g

y

.f,,

NUCLEAR REGULATORY COMMISSION

2

Te

o

REGloN il

E

101 M ARIETTA STREET.N.W.

3

"'

\\***2[)f

ATLANTA, GEORGI A 30303

DEC 181978

In Reply Refer To:

RTT:RWW

50-537/78-1

U. S. Department of Energy

.

CRBRP Project

P. O. Box U

Oak Ridge, Tennessee 37830

Gentlemen:

This refers to the inspection conducted by Messrs. R. W. Wright and

C. R. McFarland of this office on December 1, 1978, of activities

associated with your application for an NRC Construction Permit for

Clinch River Breeder Reactor Plant and to the discussion of our findings

held with Mr. J. W. Anderson at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously

reported unresolved items. The status of these items is discussed in

the enclosed report.

Within the scope of this inspection we identified no significant devia-

tions from the requirements of 10 CFR 50, Appendix B, " Quality Assurance

Criteria for Nuclear Power Plants," of the NRC regulations.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

v3o129 o u 5'

.

DEC 181978

-

U. S. Department of Energy

-2-

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to with nld

such information from public disclosure. Any such application mv t

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepr<ed

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

/

./

' rph , Chi

C. E.

i

React

Construction and

Eng

.ering Support Branch

Enclosure:

Inspection Report No.

50-537/78-1