Forwards IE Insp Repts 50-010/78-31,50-237/78-29 & 50-249/78-29 on 781115-17,21 & 22 & Notice of Violation
ML19289C860
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 01/03/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19289C861 List:
References
NUDOCS 7901250320
Download: ML19289C860 (2)


See also: IR 05000010/1978031

Text

q

r.

.

t#

%,

UNITED STATES

[t

NUCLEAR REGULATORY COMMISSION

y9

j ,J d ). g

REGloN lit

.

e

-

p

799 ROOSEVELT ROAD

f

GLEN E LLYN, ILLINOIS 60137

y,

- "***

JM0'

A9

.

Docket No. 50-10

Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, Illinois 60690

Gentlemen:

This refers to the inspection conducted by Messrs. L. R. Greger

and J. W. Hiatt of this of fice on November 15-17, 21, and 22, 1978,

of activities at Dresden Nuclear Power Station, Units 1, 2, and 3

authorized by NRC Licenses Nc. DPR-2, No. DPR-19, and No. DPR-25

and to the discussion of our findings with Mr. Roberts and others

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be

in noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this

office within twenty days of your receipt of this notice a written

statement or explanation in reply, including for each item of non-

compliance: (1) corrective action taken and the resuits achieved;

(2) corrective action to be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

..

,