ML19289C817

From kanterella
Jump to navigation Jump to search
Provides Suppl Info Re 781027 Seismic Event.Event Was Rated Richter Magnitude of Approx 2.8 & Epicenter of Earthquake Determined to Be Less than 1/4 Mile from Motion Accelerometer
ML19289C817
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/05/1979
From: Crews E
SOUTH CAROLINA, STATE OF
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19289C815 List:
References
NUDOCS 7901250230
Download: ML19289C817 (2)


Text

.

kf h

- .~-

u Ap s f e r. '

  • - SOUTH CAROLINA ELECTRIC & GAS CO'HPANY pos, OF r*C C .OE ,84 CotuMaiA Souta CAROLINA 292 t8 m ,

E. H. Ca rw s. J m. sh h, v.u-a........ ... c. . cucome

c. -. c . .

January 3, 1979 dy g:g2 g Y

..o.

3 a i11973 > &:

(91 o'* " % $

Mr. Harold R. Denton, Director p..g *% . /

Office of Nuclear Reactor Regulation N' .< .

U. S. Nuclear Regulatory Cocmission Nk -'

ggj/ i Washington, D. C. 20555

Subject:

Virgil C. Suc=er Nuclear Station Docket No. 50-395 Seismic Monitoring

Dear Mr. Denton:

This letter supplements information contained in my letter of Novenber 2, 1978, notifying you of a seismic event occurring on -

October 27, 1978, which was recorded by the seismic networks of the Applicant and the United States Geological Survey.

The October 27, 1978 seismic event was recorded by the Applicant's seismic network and was rated a Richter magnitude.of approximately 2.8.

The epicenter of this earthquake has now been detemined to be less than 1/4 mile from the USGS strong motion accelerometer which is located approx-i=ately - one (1) mile northwesc. of the nnelae 6e4'4ty. Tha.USGS.has.

reviewed the data recorded by the strong motion accelerometer and has infor=ed the Applicant that this event produced peak ground acceleration values of .13g and .24g in the two horizontal directions and .17g in the vertical direction. The total time duration of ground motion exceeding

.10g,was .3 second.

For completeness, I would also note that a second seismic event occurred on October 27, 1978 which had a value of 2.5 on the Richter scale. However, in as much as your staff has indicated that seismic events of 2.5 Richter value or less need not be reported except through routine reports, this pro-cedure is being followed in that case.

Both of these events the facility and are of tele [s[gnificance.re wep vithin the seismi eyt ly yours, E. . s MB'J:EHC:rh 7 9 012 5 0 J23 0

s cc: H. T. Br'.>b ^