ML19289C813

From kanterella
Jump to navigation Jump to search
Notification of 790122-24 Meeting in San Jose,Ca W/ Representatives of Mark I Owners Group to Discuss Mark I Long Term Program Load Definition Rept & Related Issues.W/ Encl Agenda
ML19289C813
Person / Time
Site: Oyster Creek
Issue date: 01/08/1979
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TASK-06-02.A, TASK-6-2.A, TASK-RR NUDOCS 7901250227
Download: ML19289C813 (4)


Text

.

[

UNITEO ST ATES yV

  • 1 NUCLEAR REGULATORY COMMISslON

$fC j

WASHINGTCN. D. C. 20555

  • lG,3 } !

a

),..

  • JAN 8 1979 MEMORANDUM FOR:

D. G. Eisenhut, Acting Assistant Director for Systems and Projects, Division of Operating Reactors FROM:

C. I. Grimes, Task Manager A-7

SUBJECT:

FORTHCOMING MEETING WITH REPRESENTATIVES OF THE MARK I OWNERS GROUP DATE & TIME:

Monday, January 22, 1979 2:00 pm Tuesday, January 23, 1979 8:30 am Wednesday, January 24, 1979 8:30 am LOCATION:

San Jose, CA l/22/79 GE Pruneyard Towers 1/23-24/79 Hyatt House

~

PURPOSE:

To discuss the Mark I long Term Program Load Definition Report and related issues. A pro-posed agenda is attached.

ATTENDEES:

NRC - C. Grimes, J. Fair, J. Kudrick, N. Su BNL - G. Maise, J. Ranlet, R. Kosson, C. Tung, C. Economos, A. Sonin (MIT), G. Bienkowski (Princeton)

GE - B. Buchholz, L. Steinert, et. al.

Mark I Owners - TRC Representatives EPRI - C. Sullivan, et. al.

LLL - E. McCauley, et. al.

$M4h C. Grimes Task Manager A-7

Enclosure:

As stated cc: see page 2 7 9012 5 0 M7

b PROPOSED AGENDA January 22, 1979 d:00 - 7r00 pm Discussion of two and three dimensional pool swell test results 1.

20/3D data comparisons 2.

three dimensional effects 3.

test facility configurational differences 4.

effects of vent system orificing 5.

vent flow distributions 6.

pressure integration methodology January 23, 1979 I.

General Program Status Summary 1.

Schedule for submittal of outstanding reports.

2.

Implementation of LDR and plant-unique, analysis content.

3.

Methods for resolution of NRC questions and comments.

II. Ongoing program issues 1.

Downcomer submergence -thermal stratification 2.

FSTF application methodology 3.

Fluid - structure interaction effects 4.

Load definition error and uncertainty III. SRV Discharge Loads 1.

Quencher parametric testing

a. 1/4 scale test results
b. scaling considerations (NEDC 23713) 2.

Monticello quencher test results 3.

Bubble phasing 4

Pool temperature limits for quencher S.

Monticello mixing test results.

IV. Detailed discussion of NRC/ consultant questions and comments on Mark I Load Definition Report (NED0 21888).

January 24, 1978 Continuation of NRC/ consultant questions and comments on Mark I Load Definition Report.

. DISTRIBUTION:

H. Denton

[5RCPDM V. Stello Local POR B. Grimes Docket Files T. Carter OELD 50-10 OI&E (3) 50-219/

ACRS (16) 50-247 OSD (3) 50-259/260/269 D. Eisenhut 50-324/325 G. Lainas 50-298 G. Knighton 50-249 V. Noonan 50-331 P. Check 50-333 D. Ziemann 50-321 T. Ippolito 50-366 D. Davis 50-263 J. Stolz 50-220 R. Baer 50-293 R. Hartfield 50-277/278 D. Thompson 50-254/265 R. Tedesco 50-271 W. Butler 50-341 F. Schauer 50-354/355 J. Knight C. Anderson S. Fabic R. Cudlin N. Su R. Bosnak K. Wichman J. Fair C. Grimes H. Shaw

A N

-2 DISTRIBUTION:

H. Denton

[$ sac oni2)

V. Stello Local POR B. Grimes Dockec Files T. Carter OELD 50-10 '

OI&E (3) 50-219 ACRS (16) 50-247 OSD (3) 50-259/260/269 D. Eisenhut 50-324/325 G. Lainas 50-298 G. Knighton 50-249 V. Noonan 50-331 P. Check 50-333 D. Ziemann 50-321 T. Ippolito 50-366 D. Davis 50-253 J. Stolz 50-220 R. Baer 50-293 R. Hartfield

50. '77/278 D. Thompson 50-254/265 R. Tedesco 50-271 W. Butler 50-341 F. Schaue:-

50-354/355 J. Knight C. Anderson S. Fabic R. Cudlin N. Su R. Bosnak K. Wichman J. Fair C. Grimes H. Shaw

%