Text
NRC PUBLIC DOCUAENT F.
UNITED STATES OF AMERICA Q
NUCLEAR REGULATORY COMMISSION ci g7 BEFORE THE ATOMIC SAFETY AND LICENSING BOAR9 1
4 Q
$c? k In the Matter of
)
/
)
Docket 50-344 4
PORTLAND GENERAL ELECTRIC COMPAh"f,
)
Io t
et al
)
(Control Building Proceeding)
)
(Trojan Nuclear Plant)
)
CERTIFICATE OF SERVICE I hereby certify that on hovember 20, 1978, Licensee's letter dated November 20 with attached lists of Requests for Design Change and other work items has been served upon the persons listed below by depositing copies thereof in the United States mail with proper postage affixed for first c1 1s mail.
Marshall E. Miller, Esq., Chairman Atomic Safety and Licensing Board Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Washington, D. C.
20555 Dr. Kenneth A. McCollom, Dean Atomic Safety and Li ensing Appeal Division of Engineering, Board Architecture and Technology U. S. Nuclear Regulatory Com=ission Oklahoma State University Washington, D. C.
20555 S tillwater, Oklahoma 74074 Robert M. Johnson, Esq.
Dr. Hugh C. Paxton Assistant Attorney General 12 29 - 41st Street 100 State Of fice Building Los Alamos, New Mexico 87544 Salem, Oregon 97310 Joseph R. Gray, Esq.
Robert Lowenstein, Esq.
Counsel for NRC Staf f Iowenstein, Newman, Reis & Axelrad U. S. Nuclear Regulatory Commission Suite 1214 Washington, D. C.
20555 1025 Connecticut Ave., N. W.
Washington, D. C.
20036 Columbia County Courthouse Law Library Mr. Eugene Rosolie Circuit Court Room Coalition for Safe Power St. Helens, Oregon 97051 215 S. E. 9 th Ave nue Portland, Oregon 97214
.d.s. Nina Bell 632 S. E.18th Street Mr. Stephen M. Willingham Portland, Oregon 97214 555 N. Tomahawk Drive Portland, Oregon 97217
(.
781214 OAT 7 T
CERTIFICATE OF SERVICE Columbia Environ = ental Council P. O. Box 611 John H. Socolofsky, Esq.
Assistant Attorney General St. Helens, Oregon 97051 Of Attorneys for the State of Oregon Mr. John A. Kullberg 100 State Office Building Route 1, Box 250Q Salem, Oregon S7310 Sauvie Island, Oregon 97231 Gregory Kafoury, Esq.
Mr. David B. McCoy Counsel for Columbia Environmental Council 348 Hussey Lane 202 Oregon Pioneer Building Grants Pass, Oregon 97526 320 S. W. Stark Ms. C. Gail Parson Portland, Oregon 97204 P. O. Box 2992 William Kinsey, Esq.
Kodiak, Alaska 99615 Bonneville Power Administration P. O. Box 3621 Docketing and Service Section Office of the Secretary Portland, Oregon 97208 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 C%.
{U. \\]u h%l w
Ronald W. Johnson Corporate Attorney Porrland General Electric Company Dated:
November 20, 1978
n p.m
- m a w PcrJcnd General EecMc CcnT_any jl i 4.!bi November 20, 1978 Marshall E. Miller, Esq., Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Dr. Kenneth A. McCollom, Dean Division of Engineering, Architecture & Technology Oklahoma State University Stillwater, Oklahoma 74074 Dr. Hugh C. Paxton 1229-41st S treet Los Alamos, New Mexico 67544 Gentle =en:
Attached to this letter is a revised list of Requests for Design Changes (RDCs) which replaces the list transmitted to you by my letter of November 9, 1978.
Field checking and design development of seismic piping restraints and snubbers has led to revisions of some of the items on our list of November 9,1978.
In addition, some items were incorrectly described in the earlier list.
The revisions and corrections are as follows:
Job 1 The elevation has been corrected to 37.
Job 2 The location has been corrected to the Fuel Building.
Job 4 The attachment location has been revised to the floor.
Job 5 The restraint has been changed to a rigid hanger on 24-in. CCW piping attached to floor support steel in the Fuel Building.
Job 7 The attach =ent location has been revised to the floor, and the snubber number has been changed.
Job 8 The elevation has been revised to 46 f t, and the location corrected to the Fuel Building.
Job 9 The snubber has been revised to a rigid restraint attached to a structural steel column, and the support number revised to suit.
2 1., s~r 57++- ::~ r : : +;:- T::-
R:rtana General Eec:nc Messrs. Miller, McCollom and Paxton November 20, 1978 Page two Job 10 Attachment location has been revised to the wall.
Job 11 This job has been changed from addition of a snubber to relocation of an existing rigid restraint and revision of the restraint number.
Job 13 The restraint number has been changed.
Job 14 The snubber has been revised to a modification of a structural steel restraint, and the support number revised to suit.
Job 16 Attachment location has been revised to structural floor support steel.
Job 17 The snubber has been revised to a rigid restraint.
The line and support numbers have been changed.
Job 18 Location in the Auxiliary Building has been designated.
The revised list is provided as Attachment 1.
Provided as Attachment 2 is a new list of Requests for Design Change and another work item which supplements previous lists.
As before, the 1:. ems on these lises will not affect the load carrying capabilities of any major shear wall.
The Licensee will continue to keep the Board informed of all activities at Trojan which may be construed as being related to the Trojan Control Building.
Sincerely,
.W.
Ronald W. Johnson Corporate Attorney Portland General Electric Company RWJ/U4E/kk/4crwTIC3B29 Attachment c:
R. H. Engelken Nuclear Regulatory Commission, Region V A. Schwencer Nuclear Regulatory Commission
~
(Revised Nove=ber 20, 1978)
ATTACIDENT 1 Following is the list of Request for Design Change (RDC) work items for which field work may be performed within the next few weeks.
The relationship of the work with the Control, Auxiliary and Fuel Building structures is briefly summarized below:
RDC No.
Modification Relationship 78-095 Job #1:
Restraint addition A strut assembly with a pipe to Component Cooling Water attach =ent will be added to (CCW) line E3D-28-1 (SR-301) the vertical run of 12" dia-meter CCW line and will be attached to a wall in the Auxiliary Building at elevation 37'.78-095 Job #2:
Restraint addition A strut assembly will be te.CW line E3D-22-4 (SR-300) connected to the vertical run of 4" diameter CCW piping and attached to a wall in the Fuel Building at elevation 56'.78-095 Job #3:
Restraint addition A s trut assembly will be to CCW line E3D-22-3 (SR-300) added to a horizontal run of 4" dia=eter CCW piping.
The assembly will be attached to a wall in the Auxiliary Building at elevation 66'.78-095 Job 14:
Restraint addition A strut assembly at eleva tion to CCW line E3D-31-2 (SR-301) 76' will be attached to the floor.
This restraint is for a vertical run of 14" diameter CCW piping in the Auxiliary Building.78-095 Job 15:
Restraint addition This rigid hanger asse=bly to CCW line E3D-27-3 (SR-300) will be added to 24" diameter CCW piping in the Fuel Building at elevation 53'.
The assembly will be attached to floor suppo rt steel.78-095 Job 16:
Snubber additica to A =echanical snubber assembly CCW line E3D-28-2 (SS-300) attached to a vall in the Auxiliary Building will be added as a res traint to a 12" diameter CCW line at eleva tion 5 3 '.
RDC No-Modification Relationship 78-09 Job #7:
Snubber addition to A snubber assembly at elevation CCW line EBD-27-3 (SS-301) 53' will be connected to the CCW line and attached to the floor at elevation 45' of the Fuel Building.78-095 Job #8:
Snubber addition to One snubber assembly will be CCW line EBD-27-3 (SS-302) attached to a pipe stanchion welded to the 24" diameter CCW Line at elevation 46' and attached to a wall in the Fuel Building.78-095 Job #9:
Restraint addition A structural steal restraint to CCW line EBD-27-4 (SS-300) for the CCW line will be attached to existing piping restraint steel in the Auxiliary Building at elevation 46'.78-095 Job #10:
Restraint addition A seismic restraint will be to CCW line EBD-33-1 (SR-300) installed on a CCW line at elevation 69' mounted to a wall of the Auxiliary Building.78-095 Job fil:
Relocation of a A strut assembly will be restraint on CCW line attached the floor in the EBD-33-1 (SR-301)
Fuel Building and connected to an 8" diameter CCW line at elevation 64'.78-095 Job #12:
Snubber addition A snubber assembly will be to Saf ety Injection Pump connected to a steel beam discharge line attached o the concrete SI-150lR-1-1(SS-300) floor in the Auxiliary Building for the vertical run of 4" diameter Saf ety Injection Pump discharge line at eleva tion 64'.78-095 Job #13:
Restraint addition An additional structural to Residual Heat Renoval steel seismic restraint for (RER) line HCC-39-2 (SR-300) a horizontal run of the 4" RHR line to the Spent Fuel Pool line will be attached to a wall of the Auxiliary Building at elevation 85'.
-W
RDC No.
Modification Relationshio 78-095 Job #14:
Restraint addition A s tructural s teel res traint to Containnent Spray Pump will be attached to existing discharge line structural s teel at elevation GCB-9-1 (SR-300) 15 ' for the 10" diameter Containment spray pumps discharge line.
Tha line is located in the Auxiliary Building.78-095 Job #15:
Snubber addition A snubber assembly with steel to Containment Spray Pump beams attached to a wall of discharge line the Auxiliary Building will GCB-9-1 (SS-301) be installed in the vertical run of a 10" diameter Contain-ment Spray Pump discharge line at elevation 22'.78-095 Job #16:
Snubber.3dition A snubber assembly attached to Contain=ent Spray Pump to structural floor support discharge line steel in the Auxiliary Building GC3-9-1 (SS-302) will be installed for the vertical run of a 10" diameter Containment Spray Pump discharge line at clevation 53'. ~
78-095 Job #17:
Restraint addition A s trut assembly will be to Containment Spray Pump mounted to a wall of the discharge line Auxiliary Building for the GCB-9-1 (SR-303) 10" diameter Coutaic=ent Spray Pump discharge line at elevation 5 9'.78-095 Job #18:
Restraint addi-This modification adds an tion to Chemical and Volume angle support to an exist-and Control System (CVCS) ing support for a 3" CVCS line CS-250lR-28-2 (SR-300) line.
The pipe is located in the Auxiliary Building at elevation 83'.
TEB/jf/CB-325 ATTACHMENT 2 Following is the list of Request for Design Change (RDC) and other work items for which field work may be perfor=ed within the next few weeks.
The relationship of the work with the Control, Auxiliary and Fuel Building structures is briefly summarized below:
RDC No.
Modification Relationship 78-095 Job 119:
Snubber addition A pair of =echanical snubber DCP #2 to CVCS line CS-151R-12-5 assemblies will be added to the (SS-300) 3" dia=2ter CVCS piping at Elevation 86 in the Auxiliary Building.
The assembly will be attached to a wall.
MR Addition of access ladder to Two ladders will be attached to 4282 Decontamination Shop HVAC nonbearing walls at the south equipment end of the Decontanination Shop at Elevation 93 in the Fuel Building.
L'a'E /4kkSB9