ML19289B940
| ML19289B940 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 10/07/2019 |
| From: | Deist J Framatome |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| Shared Package | |
| ML19289B919 | List: |
| References | |
| JMD:19:014 | |
| Download: ML19289B940 (3) | |
Text
framatome October 7, 2019 JMD:19:014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Office of Nuclear Security and Incident Response One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738
Subject:
Gentlemen; Framatome Richland Facility Emergency Plan Transmittal to USNRC Headquarters Document Control Desk Enclosed is a CD-ROM that includes the latest revisions of the Framatome Richland Facility's Emergency Plan (E08-01-1.0), Emergency Plan Implementing Procedures (E08-03-X.XX), and Memoranda of Understanding (E08-04-X.XX). The document number designations "X.XX" are used to encompass all applicable document numbers, e.g. E08-03-1.1, E08-03-2.1, E08-03-3.11, etc. For your convenience, I have enclosed a document summary in hard copy. This summary includes a listing of folders, files, and document numbers and titles that are included on the CD-ROM. An electronic copy of the summary is included in the root directory of the disc.
Please destroy any previous copies of these documents that you still have on file.
10 CFR 70.32(i) requires emergency plan revisions to be furnished to the USNRC within six months after changes are made. On 08/02/2019, the Framatome Richland Emergency Plan (E08-01-1.0) was revised to version 14.0, which is the current revision. A nature of change listing and the electronic signature page is enclosed with this letter. Framatome received USN RC pre-approval of version 14.0 in a letter (Enterprise Project Identifier L-2019-EPR-0002) dated 07/10/2019.
Additional copies are being sent to Framatome Richland's USN RC Project Manager (Osiris Siurano-Perez), USNRC Region II (Richard Gibson), and the USNRC Senior Resident Inspector at Columbia Generating Station (Gregory Kolcum).
If you have questions regarding this transmittal, please contact me at (509) 375-8285 or via email at jeff.deist@framatome.com.
Very truly yours,
~(
Jeffrey M. Deist, Emergency Preparedness Coordinator Environment, Health, Safety & Licensing Enclosure Framatome Inc.
2101 Horn Rapids Road Richland, WA 99354 Tel: (509) 375-8100 www.framatome.com
Framatome Richland Emergency Plan - Document Summary Page 1 of 2 Root Directory Filename Descri tion Document Summa for Transmittal 01,03,04 This document Folder= E08-01 Emergency Plan Filename Document Title E08-01-1.0 Folder= E08-03 Implementing Procedures Filename Document Title E08-03-1.1 Classifvinq an Emerqency E08-03-2.1 Protective Action Decisions E08-03-3.1 Plant Emergency Director E08-03-3.1A Interim Plant Emergency Director E08-03-3.2 Security Liaison E08-03-3.3 Process Support Liaison E08-03-3.4 Accountability Liaison E08-03-3.5 PERT Liaison E08-03-3.6 Recorder E08-03-3.7 Staqinq Area Supervisor E08-03-3.8 PERT Incident Commander E08-03-3.9 Public Information Liaison E08-03-3.10 Licensing Liaison E08-03-3.11 Environmental Safety Liaison E08-03-3.12 Central Guard Station Officer E08-03-3. 13 County Emerqency Operations Center Liaison E08-03-3.14 Corporate CAT Liaison E08-03-4.1 Incident Notification Form E08-03-4.2 Incident Notification Worksheet E08-03-4.4 Incident Notification Worksheet - PERMT E08-03-4.5 Plant Public Address Emerqency Messaqe Format E08-03-5.1 After Action Report Form E08-03-6.1 Radioloaical Field Team Procedures E08-03-6.2 Chemical Field Team Procedures E08-03-6.3 Personnel Monitoring E08-03-6.5 Spill Response Plan E08-03-6.6 Response to Severe Earthquake E08-03-6.7 Response to Tornado/ Hiqh Winds E08-03-6.8 Response to Volcano Eruption E08-03-6.9 Response to Severe Floods E08-03-7.1 Public Information Officer E08-03-7.2 Assistant Public Information Officer E08-03-7.3 JIC Spokesperson E08-03-7.4 Media Phone Team
Framatome Richland Emergency Plan - Document Summary Page 2 of 2 Filename Document Title E08-03-7.5 Public Information Phone Team E08-03-7.6 Rumor Control Team E08-03-7.7 News Team E08-03-7.8 JIC Secretarv and Clerk E08-03-7.9 JIC Outside Aaency Representatives E08-03-8.2 Plant Evacuation Procedures - Offsite E08-03-8.3 Plant Evacuation Procedures - Onsite E08-03-8.4 Plant Evacuation Procedures - Individual Buildings E08-03-8.5 Emeraency Eauipment Lists E08-03-8.6 Admittance of Essential Personnel through Roadblocks E08-03-8.7 Emergency Action Guides E08-03-8.8 Imminent Threats Involving Aircraft E08-03-8.9 Imminent Threats NOT lnvolvinq Aircraft E08-03-8.10 Chanaes in the National Terrorism Advisory System Threat Level E08-03-8.11 Response to Offsite Transportation Event E08-03-8.12 Relocatinq the Emergency Operations Center E08-03-8.13 Criticality Alarm Folder = E08-04 Memoranda of Understanding Filename Document Title E08-04-1.0 Letters of Aareement E08-04-2.2 Kadlec Reaional Medical Center E08-04-2.4 US Department of Energy, Richland Operations Office E08-04-2.5 City of Richland E08-04-2.7 Richland Police Department E08-04-2.9 Benton County Emerqency Services E08-04-2.10 Eneray Northwest E08-04-2.11 Franklin County Emergency Management E08-04-2.12 Richland Fire Department E08-04-3.1 Perma-Fix Northwest Richland, Incorporated