Forwards IE Insp Repts 50-266/80-14 & 50-301/80-14 on 800801-31 & Notice of Violation
ML19284B705
Person / Time
Site: Point Beach  
Issue date: 09/29/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19284B706 List:
References
NUDOCS 8011120685
Download: ML19284B705 (2)


See also: IR 05000266/1980014

Text

/pa ancg#'o

.

UNITED STATES

5 .j ,^,'qf( i

E

NUCLEAR REGULATORY COMMISSION

  1. 1 c

REGION 111

o,, y h

/

799 ROOSEVELT ROAD

,

g'NO

U

GLEN ELLYN,ILLINolS 60137

o

  • ....

SEP 2 91980

n

"

b

ii,'

g

, ,lJ

'

<

. . -

7 ':

'

.

__

$5,}

Docket No. 50-266

M

'N-

Docket No. 50-301

.6

DJ

alip )

.~"

h JJ

2,

~

w

$9l

Wisconsin Electric Power Company

y

g

ATTN:

Mr. Sol Burstein

g

g

g

Executive Vice President

co

Power Plants

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the inspection conducted by Messrs. W. G. Guldemond,

R. L. Hague, and N. C. Choules of this office on August 1-31, 1980 of

activities at the Point Beach Nuclear Power Plant Units 1 and 2 author-

ized by NRC Operating License Nos. DPR-24 and DPR-27 and to the dis-

cussion of our findings with Mr. G. A. Reed at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

The inspection showed that action had been taken to correct

the identified noncompliance and to prevent recurrence.

Consequently,

no reply to this noncompliance is required and we have no further ques-

tions regarding this matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

    • 11120 675

.

.

,

Wisconsin Electric Power

-2-

company

SEP 2 91980

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

c5 fgy

,

[R. F. I e shman / Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-266/80-14 and

No. 50-301/80-14

cc w/ enc 1:

Mr. G. A. Reed, Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Sandra A. Bast, Lakeshore

Citizens for Safe Energy

Mr. John J. Duffy, Chief

Boiler Inspector

Mr. Peter Anderson, Wisconsin's

Environmental Decade