ML19284A896
| ML19284A896 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/07/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19284A897 | List: |
| References | |
| NUDOCS 8003180427 | |
| Download: ML19284A896 (1) | |
Text
g Alabama Power Company 600 North 18th Street
(
Post Office Box 2641 Birmmgham. Alabama 35291 Telephone 205 323-5341 k
L hbo*ts,11, Alabama Power the southem electrc system March 7, 1980 Joseph M. Farley Nuclear Plant Radioactive Effluent Release Report Mr. James P. O'Reilly U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Reference our letter of February 27, 1980 transmitting the Joseph M.
Farley Nuclear Plant Semi-Annual Radioactive Ef fluent Release Report for the second half of 1979.
The Batch Release Mode Meteorological Data portion of Table 4A is herewith transmitted for inclusion in the report for the second half of 1979.
Also enclosed are corrected sheets of Tables lA,1B,1C and 2A for the Joseph M. Farley Nuclear Plant Semi-Annual Radioactive Effluent Release Report for the second half of 1978. These corrections were previously identified and discussed with Mr. C. M. Hosey, Region II, U. S. Nuclear Regulatory Commission.
If you have any questions, please contact us.
/
Yours very truly, F. L. Clayton Jr.
FLCJr/WMJ:bhj Eaclosures cc: Director (w/ Enclosure) /
~
Office of Nuclear Reactor Regulation
/
k Director (w/ Enclosure) l(
Office of Inspection & Enforcement Mr. R. A. Thomas (w/ Enclosure)
Mr. G. F. Trowbridge (w/o Enclosure) 800318O M I
.,