VERM0!!T YAllKEE ITUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-02 FOR THE MONTH OF FEBRUARY, 1979 700315 0 cRt/7
l OPERATLNG DATA REPORT DOCKET NO. 50-271 DATE 790312 CONIPLETED BY 9
" 9incren TELEPil0NE (617)366-9011 x2281 OPERATING STATUS otes
- 1. Unit Name:
Vert'ont Yankee
- 2. Reporting Period:
Febcuarv, 1979
- 3. Licensed Thermal Power (SIWt):
1593
- 4. Nameplate Rating (Gross.\\lWe):
540
- 5. Design Electrical Rating (Net 31WeJ:514 (Onen Cvele) 504(Clo: ed Cycle) 535
- 6. Sf aximum Dependable Capacity (Gross 31We):
504
- 7. Sf aximura Dependable Capacity INet SIWE):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Lesel To which Restricted,If Any (Net.\\1We):
- 10. Reasons For Restrictions,if Any:
(
This Stonth Yr. to-Date Cumulative
!!. Ilours in Reporting Period 672 1,416
-56,450.75
- 12. Number Of flours Reactor Was Critical 67' 1 ^16 45 105 81 13 Reactor Resene Shutdown 11ours 0
0 0
- 14. Ilours Generator On-Line 672
- 15. Unit Reservs Shutdown Ilours 0
1,416 43,549 0
0
- 16. Gross Thermal Energy Generated (SIWil) 1,061,472.5 2,238,705 60,625,522.5
- 17. Gross Electrical Energy Generated (51Wil) 363,432 _
766,582 20,106,050 18 Net Electrical Energy Generated (SIWil) 348,916 736,123 19,055,652
- 19. Unit Senice Factor 100 100 77.1
- 20. Unit Asailability Factor 100 100 77.1
- 21. Unit Capacity Factor (Using SIDC Net) 103 103.2 67.0
- 22. Unit Capacity Factor (Using DER Net) 101 101.2 65.7
- 23. Unit Forced Outage Rate 0
0 7.1
- 24. Shutdowns Scheduled Oser Nest 6.\\1onths (Type. Date,and Duration of Each):
March 17, 1979 2 weeks refueling
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY CON!st ERCI A L OPER ATION (9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 790312 CONIPLETED BY R. h. Sjoeren TELEPfl0NE (617)366-9011 x2281 SiONTil February, 1979 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (S!We-Net)
(31we. Net !
523 522 y
3.,
523 504 2
18 3
524 520 19 510 522 4
20 523 522 5
21 521 523 6
523 522 7
23 8
524 522 24 523 489 9
25 10 524 523 26 498 522 11 2,
522 524 12 33 522 13 9
520 14 15 520 31 16 522 INSTRUCTIONS On this format.hst the average dady unit power lesel in N!We. Net for each day in the reportin;: month. Compute to the nearest whole megawatt.
(0177)
50-271 UNIT SilUlDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAh!E Vermont Yankee DATE 790312 REPORT AIONTil February, 1979 COMPLETED ltY R. M. Sincren TELLP110NE (617) % 6-9011 x2281 C
.5 E
}
$ $i Licensee
~cs, D,
Cause & Corrective No.
Date g
5g
,j g 5 Event
{?
93 Action to jE 5
5gc Itcport #
mV EU Prevent Itecurrence F
g u
e c
79-3 790204 S
O 11 4
NA NA 11-Turbine Surveillance (Power Iteduc t i on)
I 2
3 4
F: l'ois ed Iteason:
Metliod:
Extiibii G - Instructions S. Scheduled A-lhpulunent F.nturc (Explain) 1-Manual for Picparation of Daia II. Maintenance or Test 7 Manual Serain.
Entry Sheets f or 1.icensec C Itclueling 3 Automatic Serain.
Event Iteporn (Ll!!t) 1 de INUlti.G-D.Itegulatory Itestriction 4 Other (lixplain) 0161) li Dpeutor l~iaining & License Examination F. A ib oi ni' t e a s i.'c G ()pe r a tion.il I.e s or (l.xplain )
Ex!nbit 1 - SJmC SoulcC Pr/17)
II (Illie: (l!xplain)
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 790312 COMPLETED bY R. M. Sjogren TELEPIIONE (617) 366-9011 x2281 SAFETY RELATED flAINTENANCli NATURii OF Ll!R OR OUTAGli MALIUNCTION EQUIP?!ENT F1AINTliNANCE NU!!BER CAUSli 1:LSU LT ColulECTIVli AC1 ION LPRM Ion Chamber Power Preventive NA Possible Component False 111 Flux Trip Replace Parts as necessary Supplies MR 78-1107 Deterioration "A" Diesel Generator Fuel Corrective NA Dirt Buildup High Differential Replaced Filter Oil Filter MR 79-80 Pressure "A" 125V Battery / Charger Corrective NA Damaged Indicating AC Input Indication Replaced Socket Assembly MR 79-87 Light Socket Lost i
"A" Fuel Pool ARM Corrective NA Failed Parts Downscale Indication Replaced Parts as necessar MR 79-94 Torus Level Transmitter Corrective LER 79-04/3L Dirt Buildup Failed Transmitter Replaced transmitter 16-19-38A MR 79-129 "A" Fuel Pool ARM Corrective NA Failed Parts Spurious Alarms Replaced Parts as necessary MR 79-131 Causing Group 3 79-140 Isolation SBCT Fan REF 2A Preventive NA Worn Belts Belt Slippage Replace Belts MR 79-137 APRM "F" Corrective NA Failed Parts Drifting Indication Replaced Parts as necessary MR 79-141 "A" SBCT Demister Preventive NA Dirt Excessive Demir,ter Replaced Demister MR 79-142 Differential Pressure "C" Main Steam Line Corrective NA Loose Packing Leakage at valve Adjusted Packing Drain Pot Isolation MR 79-157 stem
- Valve MS 802
+
DOC::ET NO.
50-271 UNIT Vermont Yankee DATE 790312 CO:!PLETED BY R. M. Sjouren TELEPl!O:'E (617)366-9011 x2281 REPORT '!ONT!! rebruary, 1979 SU:0!ARY OF OPERATING EXPERIENCES Highlights Ve rmon t Yankee operated at 99.2% of rated thermal power for the month of February, 1979. Gross electrical generation for the month was 363,432 Enha, Operations Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
2-1 At the beginning of this report period, the plant was operating at 99% of rated thermal power.
2-4 At 060] hours power was reduced to,78% for turbine surveillance. A return to full power was initiated at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />.