ML19284A527
| ML19284A527 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 12/08/1978 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML19284A528 | List: |
| References | |
| NUDOCS 7903070083 | |
| Download: ML19284A527 (3) | |
See also: IR 05000286/1978028
Text
.
h
[
%
UNITED STATES
S
NUCLEAR REGULATORY COMMISSION
j
,. g
REGION l
'C
$31 PARK AVENUE
[
KING OF PRUSSI A, PENNSYLVANI A 19406
,
.....
Docket tio. 50-286
8 DEC 1978
Power Authority of the State of fiew York
Indian Point 3 tiuclear Power Plant
ATTrt:
Mr. J. P. Bayne
Resident Manager
P. O. Box 215
Buchanan, tiew York 10511
Gentlemen:
Subject:
Inspection 50-286/78-28
This refers to the inspection conducted by Mr. T. Rebelowski of this
office on September 27 to October 28, 1978, at Indian Point fluclear
Generating Station, Unit 3, Buchanan, tiew York, of activities authorized
by f1RC License fio. DPR-64 and to the discussions of our findings held by
Mr. Rebelowski with Mr. J. Bayne of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
l etter.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the item
of noncompliance brought to your attention in a letter dated July 16,
1978.
We have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with fiRC requirements,
as set forth in the tiotice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974.
This
nctice is sent to you pursuant to the provisions of Section 2.201 of the
f4RC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Although Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement of explanation,
we note that this item of noncompliance was corrected prior to the com-
pletion of our inspection, and therefore, no response with respect to
this matter is required.
7903070633
.
.
Power Authority of the State of
2
8 DEC 1978
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section
2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
Additionally, and in accordance with Section 2.790(d) of the NRC's
" Rules of Practice," Part 2, Title 10, Code of Federal Regulations,
documentation of findings of your control and accounting procedures for
safeguarding ::pecial nuclear materials and your facility security procedures
are exempt from disclosure; therefore, Appendix A, will not be placed in
the Public Document Room and will receive limited distribution.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
n
-
,
1o
J. Brunner, Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation (Contains 2.790 Information)
2.
Office of Inspection and Enforcement Inspection Report Number
50-286/78-28
.
. .
Power Authority of the State of
3
8 DEC 1978
cc:
George T. Berry, General Manager and Chief Engineer (Without Appendir.
A)*
L. R. Bennett, Assistant General Manager - General Counsel (Without.
Appendix A)*
G. M. Wilverding, Licensing Supervisor (Without Appendix A)*
P. W. Lyon, Manager - Nuclear Operations (Without Appendix A)*
A. Klausmann, Director, Quality Assurance (Without Appendix A)*
D. Halama, Site Quality Assurance Engineer (Without Appendix A)*
J. F. Davis, Chairman, Safety Review Comittee (Without Appendix A)*
J. M. Makepeace, Director, Technical Engineering (Con Ed) (Without
Appendix A)*
- contains 2.790 Infornntion