ML19284A444
| ML19284A444 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/28/1979 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19284A445 | List: |
| References | |
| NUDOCS 7903060428 | |
| Download: ML19284A444 (4) | |
Text
- coe go N'oo; a
e oQ
'd coe Florida foyer
- >yggahgafgTg February 28, 1979 Direccor Office of Nuclear Reactor Regulation Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Subj ect: Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72
Dear Sir:
Enclosed are three (3) originals and forty (40) copies of the Report BAW-1521, February 1979, Crystal River Unit 3 Cycle 2 Reload Report and forty (40) copies of the report, Environmental Impact Appraisal and Balarg of Plant Review for Cycle 2 Reload and Power Level Upgrade.
These reports justify the operation of Crystal River Unit 3 (Cycle 2) at a rated core power of 2544 MWt which corresponds to the ultimate core power level identified in the Crystal River Unit 3 FSAR.
Section 8, Proposed Modifications to Technical Specifications of BAW-1521, is included for completeness of information only. A formal request for Technical Specification changes will be filed under separate letter.
CPC consider the Cycle 2 Reload and Power Level Upgrade to be a Class V Amendment per 10 CFR 170.22 and hereby submits our licensing fee in the amount of twenty one thousand eight hundred dollars ($21,800). FPC filed Technical Specification Change Request No. 27 on November 29, 1978 which included a licensing fee in the amount of four thousand dollars ($4,000).
Since Change Request No. 27 and our present amendment request are related to the same subject (power level upgrade), we are applying the $4,000 licensing fee, together with the $21,800 fee we are submitting with this application, for a total licensir fee of $25,800 which is consietent with the 10 CFR 170.22.
Based on the analyses and reviews performed in the enclosed reports, it has been concluded that Crystal Riier Unit 3 can be safely operated for Cycle 2 at the rated core power level of 2544 MWt.
Simpson (RadImpact)
D52 7 9 0 3 0 6 0 4 2)J General Office 3201 inirty-fourtn street soutn. P.O Box 14o42. st. Petersburg. Florida 33733 e 813-866-5151
Page 2 February 28, 1979 Please advise if further discussion of the enclosed reports is desired.
Sincercly, FLORIDA POWER CORPORATION b bltV,[
W.P.' Stewart Enclosures Simpson (RadImpact)
D52 File:
3-0-3-a-3
STATE OF FLORIDA COUNTY OF PINELLAS W.P. Stewart states that he is the Director, Power Production, of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Cmmission the infonnation attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, infonnation and belief.
[
bd.hnY on t&, V W.P. Stewart Subscribed and sworn to before me, a fiatary Public in and for the State and County above named, this 28th day of February,1979.
Ld b
W Notary Ptiblic Notary Public, State of Florida at Large, My Camission Expires:
July 25,1980 (Notary 1 D12)
UNITED STATES OF AMERICA NUCLEAR REGULATORY (DMMISSION IN THE MATTER OF DOCKET NO. 50-302 FLORIDA POWER CORPORATION
)
CERTIFICATE OF SERVICE W.P. Stewart deposes and says that the following has been served on the Chief Executive of Citrus County, Florida by deposit in the United States mail, addressed as follows:
Chainnan, Board of County Commissioners of Citrus County Citrus County Courthouse Inverness, Florida 32650 An original copy of our February 28, 1979 submittal.
FLORIDA POWER CORPORATION r
i
~0 t tw W.P. Stewart Director, Power Production SWORN TO AND SUBSCRIBED BEFORE ME THIS 28th DAY OF FEBRUARY, 1979.
'daA.fl1 f c
Notary Public /
~
Notary Public State of Florida at Large My Commission expires: July 25,1980 (NOTARIALSEAL)
Simpson (RadImpact)
D52