Forwards QA Program Insp Rept 99900104/79-01 on 790205-08. No Noncompliance Noted
ML19282D084
Person / Time
Issue date: 03/05/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hyland F
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML19282D085 List:
References
REF-QA-99900104 NUDOCS 7905110398
Download: ML19282D084 (2)


Text

._.

9 aAasag UNITED STATES o

NUCLEAR REGULATORY COMMISSION y

  1. (/

{q g

REGION IV g

611 RYAN PLAZA ORIVE, SUITE 1000 o7-1 ARLINGTON, TEXAS 76011

,o 0 5 MAR 1979 Docket No. 99900104/79-01 Westinghouse Electric Corporation Pensacola Plant ATTN: Mr. F. B. Hyland Product Assurance Manager Post Office Box 1313 Pensacola, Florida 32596 Gentlemen:

This refers to the QA Program inspection conducted by Mr. V. H. Hunter of this office on February 5-8, 1979, of your facility at Pensacola, Florida, associated with the fabrication of reactor internals and to the discussion of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others. You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.

Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, we found no instance where you failed to meet NRC requirements.

In accordance with Section 2.790 of the Comission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any informa-tion that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to with-hold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is 7905IIOSg 9

Westinghouse Electric Corporation claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placad in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, t

b @M U dis Potapovs, Ct ief Vendor Inspection Branch