ML19282C505

From kanterella
Jump to navigation Jump to search
Forwards LER 79-017/03L-1
Date released: 10/23/2019 Download: ML19282C505


LER 79-017/03L-1 on 790227:variations in Speed of HPCI Turbine Occurred During Test.Caused by Turbine Control Loop Failure.Controls Calibrated & Actuator Determined to Be Inoperable.Actuator Was Replaced
ML19282C511
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/26/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19282C511 (1)
Forwards LER 79-017/03L-1
ML19282C503
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/26/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19282C503 (1)